My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014 NOV TPR
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
Archieved Reports
>
ARCHIVED REPORTS_2014 NOV TPR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2024 3:14:45 PM
Creation date
7/3/2020 11:14:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014 NOV TPR
RECORD_ID
PR0440011
PE
4445
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4445_PR0440011_9999 S AUSTIN_2014.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
438
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Consolidated Forward Inc. Landfill Page 5 <br /> The contractor shalt be required to employ the quietest among alternative equipment or to <br /> muffle/control noise from available equipment. <br /> 9 Forward 1993(E2) <br /> Muffling of equipment used on site shall be maintained to factory specifications. <br /> 10 Austin 1994(H1.a)(similar),Austin 2000(KI.a) <br /> 71e proposed project must conform to the San Joaquin County Noise Standards contained in <br /> the County's General Plan. The project sponsor shall be required to demonstrate <br /> complianrce with this performance standard. Fork areas could be limited work times close <br /> to the residence could be rescheduled, noise barriers such as earth berms could be designed, <br /> and rxoise monitoring shall be undertaken to demonstrate compliance in the event noise <br /> complaints are received. <br /> 11 Austin 199.1(111.b),Austin 2000(M.b) <br /> If project-related noise levels measured at the property line of any resza'---mtial use would <br /> exceed an hourly average of 45 dBa during the nighttime or 55 dBa during the daytime, then <br /> setbacks and a limitation on hours of operations shall be mandatory. As recommended in the <br /> Forts ard,Inc. Landfill Use Permit Modifications, the option of a sound'-wall at 9690 Austin <br /> Road shall be available to the resident. <br /> D.AM QUALITY/ODORS <br /> 12 (D.2) <br /> Identified in This EIR: <br /> The project sponsor shall mitigate any significant future ROG increase by developing gas <br /> wells within the Forward Landfill sufficient to achieve a recovery rate of 100 -200 of n of <br /> LFG from the Forward Landfill. The gas wells shall be integrated into the consolidated <br /> facility collection/disposal system. To maintain a less-than-significant ROG increase from <br /> existing conditions,a small LFG collection system shall be installed at the currently <br /> uncontrolled Forward Landfill before the total increased fugitive LFG release rate from all <br /> sources reaches 150 efm(equivalent to 10 tons of ROG per year). <br /> 13(DA) <br /> Proposed as Part of the Project: <br /> a. Water any excavation areas twice per day, <br /> b. Water stockpile haul roads at least once per day, <br /> c. Water the perimeter facility road once per day on any day that the road is used, <br /> d. Limit on-site travel speed to speeds less than those that would cause visible dust-emissions <br /> behind the vehicle, <br /> e. Prevent track-out of mild and dirt through the following measures: <br /> 1) Providing a paved interior road of at least 100 feet in length to allow mud <br /> and dirt to drop off before exiting the site, <br /> 2) Removing dirt and mud from interior paved roads throughout the work-day, <br /> 3) Removing any dirt deposition on Austin Road at the endo*each work-day. <br /> L Apply all-weather surfacing to any unpaved road segment that carries 50 or more vehicle <br /> trips per day continuously for more than thirty(30)days, <br /> g.Water unpaved equipment parking areas at least daily, <br /> h.Best management practices shall be followed at all times during option of the <br /> grinder/screener at the composting operation,and shall include asz---uing that inputs to the <br />
The URL can be used to link to this page
Your browser does not support the video tag.