My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014 NOV TPR
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
Archieved Reports
>
ARCHIVED REPORTS_2014 NOV TPR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2024 3:14:45 PM
Creation date
7/3/2020 11:14:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014 NOV TPR
RECORD_ID
PR0440011
PE
4445
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4445_PR0440011_9999 S AUSTIN_2014.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
438
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Consolidated Forward Inc. Landfill Page 13 <br /> site. The surface-water collection drain system will be designed w divert the water to the <br /> storm water collection basin in the southwest corner of the curr=.Austin Road Landfill,at <br /> times when enough surface water accumulates to have discharged into the collection basin. <br /> All waste at the proposed Fonard Landfill will be separated f-am.the north and south <br /> branches of Littlejohn Creek by a levee system or other acceptable method designed to <br /> protect the site from a 100-year flood event. <br /> The project includes channel reconfiguration and localized flood protection berms to isolate <br /> the landfill surfaces from floodwaters. <br /> The project design also includes provision of replacement floodplain area and storage volume <br /> in an easement along the relocated North Branch of the South Foek of South Littlejohns <br /> Creek. <br /> The channel and floodplain storage easement are designed to ae,ommodate the 100 year,24- <br /> hour storm. The design also includes a three-foot freeboard. <br /> 45(F.2) <br /> Proposed as Part of the Project: <br /> The JTD articulates the programs of drainage control structures and monitoring to inhibit <br /> erosion and sedimentation. Proposed structural controls include the drainage control system <br /> and daily cover. Operational controls include maintenance of the drainage system by keeping <br /> ditches clear of debris and excessive vegetation, and making ne_-&-i repairs to drainage <br /> structures. Corrective measures will be implemented if inspections show excessive erosion or <br /> damage to drainage channels. Eroded areas will be mitigated by removing loose debris <br /> followed by replacement,regrading,and compacting the area. & onitoring and protection <br /> against sediment from entering the Littlejohn stream channel w l be implemented,including <br /> the diversion of part of Littlejohn Creek farther away from the landfilled area. <br /> In order to minimize sediment transport to the Littlejohns Creek landfill slopes,ridgetops, <br /> and peripheral areas will be revegetated to inhibit erosion. <br /> 46(F.3) <br /> Proposed as Part of the Project: <br /> The liner and•leachate collection system for the expansion system--both over the top of the <br /> existing unlined Austin Road landfill and the extension of the cxisting leachate collection <br /> system at Forward—have been designed to meet or exceed the regulatory requirements as' <br /> shown and discussed in the applicants JTD. The JTD and the adequacy of the-.leachate <br /> collection system and associated monitoring are under review by the RWQCB. <br /> The regulatory required separation between the liner and ground-ater will be implemented to <br /> allow for chemicals in the leachate to attenuate before reaching the groundwater,should the <br /> leachate breach the collection system. <br /> The project design includes a leak detection system under the_4 gips. <br /> The Iiner system will be overlain by a protective operations laser consisting of a one-foot <br /> thickness of soil and a one-foot thick gravel layer that serves as zine leachate collection layer. <br /> This taro-foot layer will serve to protect the liner system from p or jagged materials in the <br /> waste. <br />
The URL can be used to link to this page
Your browser does not support the video tag.