Laserfiche WebLink
Consolidated Forward. Landfill Page 14 <br /> The operator will remove any hazardous materials spotted during delivery,thus minimizing <br /> the potential for leachate contamination if a break occurs in the liner or the leachate collection <br /> system. <br /> A double Iiner shall be installed un�-�r the sump area,as required by the RWQCB; <br /> Electric testing of the liner in each,Waste Management Unit shall be conducted before waste <br /> can be disposed in that Unit, as requ red by the RWQCB; and <br /> Identified in This Elft: <br /> If any modifications to the leachate collection system and associated monitoring described in <br /> the JTD are required the RWQCB_the landfill operator shall implement those changes. <br /> 47(F.4) <br /> Proposed as Part of the Project: <br /> Proposed measures to address concerns about additional leachate generation as a result of the <br /> combined landfill have been addressed in the JTD with the presentation of the EPA HELP <br /> model results based on the projected volumes of refuse,and the description of the leachate <br /> collection system designed to meet the maximum probable leachate generated. Engineering <br /> control systems(leachate collection.*-stem,drainage control,groundwater and gas controls), <br /> monitoring programs,and institutional controls have been presented in the JTD currently <br /> under review at the RWQCB. Reporting on leachate generation volume and quality is a <br /> requirement of the RWQCB-stipulated progress reporting through the various proposed <br /> landfilling phases. <br /> The landfill cell anchor trenches wM be elevated two to three feet above the surrounding land <br /> to minimize the possibility of Rarer from major storm events draining into the cells and <br /> adding to the volume of leachate. <br /> Identified in This EIR: <br /> Continued monitoring of the effectireaess of mitigation measures for leachate shall be <br /> performed by the responsible regulatory agencies(currently the RWQCB and,for the WMU- <br /> A,the DTSC). These agencies lkeep abreast of state-of-the-art information on leachate <br /> generation mechanisms and vpropdaft mitigation. If,in the future,monitoring demonstrates <br /> that the procedures above were insufficient to mitigate the effects of landfill-generated <br /> leachate,thd agencies will,as appropriate,require additional mitigation measures. <br /> 48(F.5) <br /> Proposed as Part of the Project: <br /> Maximum pre-loaded settlement of the combined landfill is projected in the JTD to provide <br /> the maximum period for settlement and take advantage of anticipated improvements in <br /> geosynthetic technology. <br /> Future design for the vertical expan-sion will, if necessary,include additional components in <br /> the liner system,depending on furore differential settlement on the liner system. <br /> The extraction wells proposed as part of the Revised Engineering Feasibility Study(AEE, <br /> 2001B)will be maintained and monitored during combined landfill build-out phases,and <br /> modified as needed based on the RWQCB's review of monitoring data. <br />