My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014 NOV TPR
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
Archieved Reports
>
ARCHIVED REPORTS_2014 NOV TPR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2024 3:14:45 PM
Creation date
7/3/2020 11:14:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014 NOV TPR
RECORD_ID
PR0440011
PE
4445
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4445_PR0440011_9999 S AUSTIN_2014.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
438
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Consolidated Forward. Landfill Page 14 <br /> The operator will remove any hazardous materials spotted during delivery,thus minimizing <br /> the potential for leachate contamination if a break occurs in the liner or the leachate collection <br /> system. <br /> A double Iiner shall be installed un�-�r the sump area,as required by the RWQCB; <br /> Electric testing of the liner in each,Waste Management Unit shall be conducted before waste <br /> can be disposed in that Unit, as requ red by the RWQCB; and <br /> Identified in This Elft: <br /> If any modifications to the leachate collection system and associated monitoring described in <br /> the JTD are required the RWQCB_the landfill operator shall implement those changes. <br /> 47(F.4) <br /> Proposed as Part of the Project: <br /> Proposed measures to address concerns about additional leachate generation as a result of the <br /> combined landfill have been addressed in the JTD with the presentation of the EPA HELP <br /> model results based on the projected volumes of refuse,and the description of the leachate <br /> collection system designed to meet the maximum probable leachate generated. Engineering <br /> control systems(leachate collection.*-stem,drainage control,groundwater and gas controls), <br /> monitoring programs,and institutional controls have been presented in the JTD currently <br /> under review at the RWQCB. Reporting on leachate generation volume and quality is a <br /> requirement of the RWQCB-stipulated progress reporting through the various proposed <br /> landfilling phases. <br /> The landfill cell anchor trenches wM be elevated two to three feet above the surrounding land <br /> to minimize the possibility of Rarer from major storm events draining into the cells and <br /> adding to the volume of leachate. <br /> Identified in This EIR: <br /> Continued monitoring of the effectireaess of mitigation measures for leachate shall be <br /> performed by the responsible regulatory agencies(currently the RWQCB and,for the WMU- <br /> A,the DTSC). These agencies lkeep abreast of state-of-the-art information on leachate <br /> generation mechanisms and vpropdaft mitigation. If,in the future,monitoring demonstrates <br /> that the procedures above were insufficient to mitigate the effects of landfill-generated <br /> leachate,thd agencies will,as appropriate,require additional mitigation measures. <br /> 48(F.5) <br /> Proposed as Part of the Project: <br /> Maximum pre-loaded settlement of the combined landfill is projected in the JTD to provide <br /> the maximum period for settlement and take advantage of anticipated improvements in <br /> geosynthetic technology. <br /> Future design for the vertical expan-sion will, if necessary,include additional components in <br /> the liner system,depending on furore differential settlement on the liner system. <br /> The extraction wells proposed as part of the Revised Engineering Feasibility Study(AEE, <br /> 2001B)will be maintained and monitored during combined landfill build-out phases,and <br /> modified as needed based on the RWQCB's review of monitoring data. <br />
The URL can be used to link to this page
Your browser does not support the video tag.