Consolidated Forward_ Landfill Page 16 <br /> 51 (F.4) <br /> Identified in This EIR: <br /> Replacement well&(as well as additional wells north of the Austin Road Landfill to better <br /> define the leading edge of the plume)shall be installed to mitigate against the loss of old <br /> swells as presented in the JTD currently under review by the RWQCB. The RWQCB roust <br /> approve the STD's plans for the number and location of the new wells as part of their: <br /> approval process,which is separate from the EIR approval process. <br /> 52 Austin 1994(K3 c),Austin 2000(%3.c) <br /> The timing of the pumped discharge from the detention pond must not occur with the peak <br /> flow rate of Little John's Creek as this would impact downstream locations by increasing the <br /> flood hazard. Telemetry, which monitors the flow in the creek to determine the peak,should <br /> be provided. This infonnation should then be used to coordinate the startup of the pumps. <br /> 53 Austin 1994(KS.e),Austin 2000(KS.e) <br /> The landfill operator would include practices and procedures in the SWFP to comply with AB <br /> 1760. The procedures would describe how the expanded landfill would salvage all <br /> economically feasible metallic discards. <br /> 54 Forward 1993(0) <br /> Diesel fuel should be stored in a manner which provides for secondary containment. <br /> G. SOILS AND GEOLOGY <br /> 55 (G.2) <br /> Proposed as Part of the Project: 1. <br /> Should additional cover material be needed,alternative daily covers,approved by the <br /> CIVVMB,will be examined and used. <br /> 56(G.3) ` <br /> Proposed as Part of the Project: <br /> The project sponsor has prepared a seismicity study for the site. If the potential maximum <br /> peak ground acceleration in the seismicity study is greater than that assumed in the <br /> preliminary design,the final project design analysis will make modifications needed to Meet <br /> the factor of safety(determinations may be subject to the approval of the CIWMB and/or <br /> RWQCB). Impacts to the new liner and drainage system instaQed over the Austin Road <br /> Landfill will be monitored as appropriate based on any stipulations of the CIWMB and/or <br /> RWQCB. <br /> 57(G.4) <br /> Proposed as Part of the Project: <br /> Overall reduction—or,in some cases,elimination or improvement—of slope instability at the <br /> project site can be achieved through the implementation of the seismic design measures <br /> designed to meet CCR Title 27. <br /> t <br /> 58 (G.5) <br /> Proposed as Part of the Project: <br /> The applicant's Joint Technical Document references an erosion management plan that <br /> delineates various actions to minimize erosion and sedimentation,including appropriate t <br /> construction,landscaping,and maintenance of graded slopes and subsurface drainage t,__ <br />