My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014 NOV TPR
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
Archieved Reports
>
ARCHIVED REPORTS_2014 NOV TPR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2024 3:14:45 PM
Creation date
7/3/2020 11:14:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014 NOV TPR
RECORD_ID
PR0440011
PE
4445
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4445_PR0440011_9999 S AUSTIN_2014.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
438
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Consolidated Fonvard Inc. Landfill Page 17 <br /> systems. As part of that plan,grading operations will be scheduled-to avoid the rainy season <br /> and be implemented by interim engineering control measures. Before grading is stopped, <br /> slopes hill be directed to carry runoff to areas where erosion and sedimentation can be <br /> controlled. Truck beds will be hosed down to reduce soil spillage on paved roads and wind- <br /> blo%-,n dust. Relocation of Littlejohns Creek could lessen the sedimentation potential to the <br /> creel;. <br /> Completed cells will be stabilized by the planting and maintenance of drought-resistant <br /> grasses. This will inhibit wind and water erosion and maxirnize the fertility of the soil in <br /> order to facilitateā¢revegetation. <br /> Temporary plantings,geofabric drapes, and erosion-preventing diversions of surface water <br /> NNill be constructed as appropriate on temporary slopes. <br /> Regular operational and post-closure monitoring of erosion control structures and plantings <br /> ,ill be done for a minimum of five years. <br /> 59 Forward 1993(B.5) <br /> Assessment ofgroundwater levels an monitoring wells shall be initiated within 24 hours <br /> follossing an earthquake event having a Modified Mercalli intensity of V or greater at the <br /> landfill. This will allow the water level database to be adjusted or seismic variations. In the <br /> mitt that anomalous water level changes are noted, a series of water quality sampling and <br /> testis g events shall be initiated by the applicant in coordination with the RWQCB to detect an <br /> changes in water quality that may sign6 subsurface adjustments in landfill cells. <br /> 60 Forward 1993(B.6) <br /> Benchmarks shall be established(these could utili_Te monitoring well top of casing <br /> elevations),which will allowfor determinations ofsettlemeni/consolidation offill materials <br /> in closed sections of the landfill on an annual basis and following significant seismic events <br /> (Modited Mercalli Scale of V or above). In the event that changes are noted, the cause <br /> should be determined as should the effect on leachate collection and recovery systems. <br /> Repair liners and LCRS as necessary. In addition, remedial grading should be accomplished <br /> to restore the original cap's function to repel water and direct surface runoff. <br /> H.BIOLOGICAL RESOURCES <br /> 61 (H.2) <br /> Identified in This EIR: <br /> Nigbt lighting with sodium lamps with sharp cutoff angles shall be used to focus light in <br /> active landfill areas(target areas)and to avoid nighttime lighting of adjacent open areas and <br /> trees. <br /> 62(H.3) <br /> Proposed as Part of the Project: <br /> As a participant in the SJCMSCP,Forward will incorporate SJCMSCP guidelines developed <br /> to minimize effects of rodenticides to the garter snake,the brush rabbit and the Swainson's <br /> Hawk(Appendix A of the SJCMSCP). <br /> Identified in This EIR: <br />
The URL can be used to link to this page
Your browser does not support the video tag.