Laserfiche WebLink
Consolidated Fonvard Inc. Landfill Page 17 <br /> systems. As part of that plan,grading operations will be scheduled-to avoid the rainy season <br /> and be implemented by interim engineering control measures. Before grading is stopped, <br /> slopes hill be directed to carry runoff to areas where erosion and sedimentation can be <br /> controlled. Truck beds will be hosed down to reduce soil spillage on paved roads and wind- <br /> blo%-,n dust. Relocation of Littlejohns Creek could lessen the sedimentation potential to the <br /> creel;. <br /> Completed cells will be stabilized by the planting and maintenance of drought-resistant <br /> grasses. This will inhibit wind and water erosion and maxirnize the fertility of the soil in <br /> order to facilitate•revegetation. <br /> Temporary plantings,geofabric drapes, and erosion-preventing diversions of surface water <br /> NNill be constructed as appropriate on temporary slopes. <br /> Regular operational and post-closure monitoring of erosion control structures and plantings <br /> ,ill be done for a minimum of five years. <br /> 59 Forward 1993(B.5) <br /> Assessment ofgroundwater levels an monitoring wells shall be initiated within 24 hours <br /> follossing an earthquake event having a Modified Mercalli intensity of V or greater at the <br /> landfill. This will allow the water level database to be adjusted or seismic variations. In the <br /> mitt that anomalous water level changes are noted, a series of water quality sampling and <br /> testis g events shall be initiated by the applicant in coordination with the RWQCB to detect an <br /> changes in water quality that may sign6 subsurface adjustments in landfill cells. <br /> 60 Forward 1993(B.6) <br /> Benchmarks shall be established(these could utili_Te monitoring well top of casing <br /> elevations),which will allowfor determinations ofsettlemeni/consolidation offill materials <br /> in closed sections of the landfill on an annual basis and following significant seismic events <br /> (Modited Mercalli Scale of V or above). In the event that changes are noted, the cause <br /> should be determined as should the effect on leachate collection and recovery systems. <br /> Repair liners and LCRS as necessary. In addition, remedial grading should be accomplished <br /> to restore the original cap's function to repel water and direct surface runoff. <br /> H.BIOLOGICAL RESOURCES <br /> 61 (H.2) <br /> Identified in This EIR: <br /> Nigbt lighting with sodium lamps with sharp cutoff angles shall be used to focus light in <br /> active landfill areas(target areas)and to avoid nighttime lighting of adjacent open areas and <br /> trees. <br /> 62(H.3) <br /> Proposed as Part of the Project: <br /> As a participant in the SJCMSCP,Forward will incorporate SJCMSCP guidelines developed <br /> to minimize effects of rodenticides to the garter snake,the brush rabbit and the Swainson's <br /> Hawk(Appendix A of the SJCMSCP). <br /> Identified in This EIR: <br />