Laserfiche WebLink
Consolidated Forward Landfill Project—Mitigation Morii.oring and Reporting Program Checklist A, 35 <br /> Implementation <br /> Mitigation Measure Implementation ; Monitoring Confirmation Comments <br /> lly(Imulr and water Responsibility:Landfill operator Responsibility. ScinJoaquin County <br /> source rming. Water source shall be shown on Environmental lieahh DeParlment <br /> Improvement Alan rming: prior to approval of Improvement <br /> plan <br /> 43 Forward 1993(4.11) <br /> Balance ash control and Responsibility:Landfill operator Responsibility:San Joaquin County <br /> Ieacliate generation Timing: Ongoing Environmental Health Department <br /> Timing:During monthly site visits <br /> F.HYDROLOGY AND WATER QUALITY <br /> 44(F.1) Drainage controls Responsibility:Landfill operator Responsibility:RWQCB <br /> Timing: Letter from RWQCB shall he Timing:Prior to isasunnce of <br /> included with the Improvement Plan Waste Disclmarge Requirements(WDRs) <br /> Channel reconiig- Responsibility:Landfill operator Responsibility:RWQCB <br /> uration and berms Timing: Letter from RWQCB shall be Timing:Prior to issuance of <br /> included with the Improvement Plan Waste Discharge Requirements(WDRs) <br /> Replacement Responsibility:Landfill operator Responsibility:RWQCB <br /> floodplain Timing:Letter from RWQCB shall be Timing:Prior to issuance of <br /> inclndetl wills IN Ittlprovoment Plan Wasto Discharge itecluircmcnts(Wl)its) <br /> Channel and Responsibility:Landfill operator Responsibility:RWQCB <br /> floodplain design Timing: Letter from RWQCB shall be Timing:Prior to issuance of <br /> included with the Improvement Plan Waste Discharge Requirements(WDRs) <br /> 45(F.2) Structural erosion Responsibility:Landfill operator Responsibility:RWQCB <br /> controls Timing: Letter from RWQCB shall be Timing:Prior to issuance of <br /> included with the hVrovem ent Plan Waste Diseharge Requirements(WDRs) <br /> Operational erosion Responsibility.Landfill operator Responsibility:RWQCB <br /> controls Timing:Ongoing Timing:Annually <br /> Revegetation Responsibility:Landfill operator Responsibility.RWQCB <br /> Timing:Upon completion of cell Timing:Annually <br /> 46(F.3) Liner and leachate Responsibility:Landfill operator Responsibility:RWQCB <br /> Collection sysltall Timing: Lettor from RWQCB shall he Tinting:Prior to issiumcc of <br />