Laserfiche WebLink
Consolidated Forward Landfill Project—Mitigation Monitoring and Reporting Program Checklist Page 36 <br /> Implementation <br /> Mitigation Measure Implementation Monitoring Confirmation Comments <br /> design included with the:improvement Plan Waste Discharge Requirements(WDRs) <br /> Separation between Responsibility:Landfill operator Responsibility:RWQCB <br /> liner and groundwater Timing.-.Letter from RWQCB shall be Timing:Prior to approval of <br /> included with the Improvement Plan Waste Discharge Requirements(WDRs) <br /> Leak detection system Responsibility:Landfill operator Responsibility:RWQCB <br /> Timing: Letter from RWQCB shall be Timing:Prior to approval of <br /> included with the Improvement Plan Waste Discharge Requirements(WDRs) <br /> Operations layer Responsibility:Landfill operator Responsibility:RWQCB <br /> over liner Timing: Letter from RWQCB shall be Timing:Prior to approval of <br /> included with the Improvement Plan Waste Discharge itequirenxmts(WDRs) <br /> Double liner under Responsibility:Landfill operator Responsibility:RWQCB <br /> sump area Timing: Letter from RWQCB shall be Timing:Prior to approval of <br /> included with the Improvement PIan Waste Discharge Requirements(WDRs) <br /> Electric testing of Responsibility:Landfill operator Responsibility:RWQCB <br /> each WMT]Iiner Timing: Prior to submission of Timing:Prior to approval of <br /> Construction Quality Control Assurance Construction Quality Control Assurance <br /> Report for each cell Report for each cell <br /> RWQCB required Responsibility.Landfill operator Responsibility:RWQCB <br /> changes Timing:As required by RWQCB Timing:As required by RWQCB <br /> 47(FA) Engineering leachate Responsibility:Landfill operator Responsibility. RWQC13 <br /> controls Timing: Letter from RWQCB shall be Timing:Prior to approval of <br /> included with the Improvement Plan Waste Discharge Requirements(WDRs) <br /> Leachate monitoring Responsibility Landfill operator Responsibility: RWQCB,DTSC <br /> Timing:Daily Timing:Quarterly <br /> Lcachatc reporting/ Responsibility:Landfill operator Responsibility:RWQCI3,IYCSC <br /> Institutional cnntrols Timing:Quarterly Timing:Qunrleriy <br /> RWQCI3 and IYI'SC Responsibility: Landfill operator Responsibility: RWQCB and/or DISC <br /> required changes Timing:As required Timing;As required <br />