Laserfiche WebLink
Pete Wilson,Governor <br /> 'OF CAIJFORNIA <br /> ,,ALIFORNIA INTEGRATED WASTE MANAGEMENT BOARD <br /> /1120 Ninth Street,Suite 100 <br /> %Sacramento,California 95814RE <br /> CE I VAPR 291991 ' <br /> MAY 21991 <br /> Mr. Ed Padilla t, ENVIRONMEN IAL HEALTH <br /> San Joaquin County '+ PERMIT/SERVICES <br /> Environmental Health Division � <br /> P.O. Box 2009 <br /> Stockton, CA 95201 <br /> subject: Report of station Site Information, Independent <br /> Trucking Transfer Station, Facility Number 39-AA-0016 <br /> Dear Mr. Padilla: <br /> I have completed my review of the January 1991 Report of station <br /> Information (RSI) for the subject facility and have the following <br /> comments: <br /> Report of Station Information (RSI1 <br /> �C Please include the average load capacity the facility will <br /> receive on a yearly basis over the next five years, <br /> expressed in tons. <br /> i <br /> b,rThe RSI should include a map showing surrounding land uses, <br /> 3and all structures within 1000 feet of the site boundary. <br /> Show distances to those structures. <br /> The RSI should include a detail description of the processes <br /> lltJ� used at the facility. Processes used may include activ ies <br /> All <br /> such as loading, unloading, compacting, shredd <br /> a1_v_a in volume reduction, rec cling etc. <br /> r fer u is spread <br /> a ompacted? Wha are o etrucks. <br /> 0• <br /> c�se �g The climatic conditions at the station should be i ded. <br /> 6 � -s This includes annual in length of rainand a wind rows <br /> P► D r c ar s owing mean annual wind velocity and direction. <br /> The RSI states that a total of 8 acres have been acquired. <br /> Please note that this may not be considered a significant , <br /> f change. <br /> Ll�s �`f The RSI states no fencing will be installed around the <br /> ul� ar�d- parcel perimeter. How is unauthorized access prevented? <br /> - '` The RSI states future operations consist of increasing the <br /> capability to remove recyclable materials up to 500 tons <br /> (2000 cubic yards) per day of incoming refuse. Note that the <br /> design capacity is 250 tons per day (1000 cubic yard) . In <br /> -✓" order to allow the receipt of more than 250 tons per day <br /> environmental review would be necessary. <br /> Printed on Recycled Paper•• <br />