Laserfiche WebLink
Mr. Padilla <br /> Page 2 of 3 <br /> Please provide additional information on the waste handling, <br /> operation and location for both the Buy Back Program and <br /> ,y,k Recycling Process. ,' i <br /> Q,fC � j Please list and describe equipment used for handling and <br /> 0 disposal of wastes. <br /> 0 <br /> Please state plans for standby equipment availability. <br /> P ®.� A description of the frequency of removal of all recyclable <br /> f.1 +� y �4V(p materials to be received and : stored on site should be <br /> p � ea®¢ �C included. Also include the contingency plans for manpower <br /> P•51 and equipment availability during emergencies. <br /> o.C. ;� C The storage and frequency removal of hazardous waste should <br /> A be included in the RSI. <br /> Please include a statement as to whether noise from station <br /> f,g operations is likely to create health hazards to persons <br /> using the site and/or to nearby residents. <br /> Please include a statement that adjacent zoning and <br /> QP �� surrounding land use is compatible with the facility or <br /> proposed facility. Describe adjacent and surrounding land <br /> uses. <br /> D�'2" A schematic drawing of the site showing site access and on- <br /> site traffic patterns should be included. Indicate the <br /> location of the buy-back program, storage of salvaged goods, <br /> and volume reduction material.. <br /> D K x,45 <br /> °'f A-" The RSI should describe access provisions in detail. <br /> p-q � Discuss on-site traffic flow, provisions for turn around <br /> P `�► traffic,stacking lanes, traffic routing and road surfacing, <br /> methods of preventing unauthorized access, locking gates, <br /> v✓ is etc C. <br /> Cid da`t`e, <br /> a a„- The RSI states facility will do frequent cleaning. 14 CCR <br /> $,4- �' 17512 requires any station handling an average volume over <br /> 100 cubic yards of waste per day be cleaned daily. <br /> 14 CCR 17441 (f) requires the RSI include a description of <br /> o•K ' transfer equipment capacity, and number of units. r <br /> ? The calculations used in determining the design capacity of <br /> the station should be included. p <br /> --,� 14 CCR 17441 (h) requires the RSI include a description of <br /> 0`.9 �''' provision to handle unusual peak loadings. 1 <br />