My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1987-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
401
>
4400 - Solid Waste Program
>
PR0440012
>
COMPLIANCE INFO_1987-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2021 2:05:04 PM
Creation date
7/3/2020 11:15:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987-2005
RECORD_ID
PR0440012
PE
4445
FACILITY_ID
FA0002420
FACILITY_NAME
INDEPENDENT TRUCKING
STREET_NUMBER
401
Direction
S
STREET_NAME
LINCOLN
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14703003
CURRENT_STATUS
02
SITE_LOCATION
401 S LINCOLN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sfrench
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4445_PR0440012_401 S LINCOLN_1987-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
653
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />Independent Trucking <br />Compliance Agreement <br />•� ' • -�• •�- •e_ <br />s <br />It is Station policy that broken glass is picked <br />is noticed. All workers have been instructed to <br />true of any other material that might become a <br />or the public. <br />August 31, 1989 <br />Page 3 <br />up as soon as it <br />do this. This is <br />hazard to workers <br />In the event of breakdown of the primary baler the backup baler is <br />used if the downtime is such that would create an amount of <br />material that could not be processed within the day or would cause <br />blockage of the station operations. If the primary baler is down <br />for only a short period of time the backup baler is not put into <br />operation since it is not as efficient as the primary baler which <br />has the capability of processing up to 18 tons per hour of incoming <br />material. Since the material being baled (cardboard) is non- <br />putresible and will not decompose if allowed to stand for a few <br />hours there was no hazard or nuisance in waiting for the primary <br />baler to be repaired. <br />We trust that the responses given above adequately address your <br />concerns and illustrate that the Independent Trucking Inc. Transfer <br />Station and Recycling Center is being operated in compliance with <br />State Regulations. <br />Very truly yours, <br />Daniel A. Maglionico, P.E. <br />cc: Greg Basso <br />Ed Padilla <br />
The URL can be used to link to this page
Your browser does not support the video tag.