My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1993_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOVELACE
>
2323
>
4400 - Solid Waste Program
>
PR0440013
>
ARCHIVED REPORTS_1993_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:10 PM
Creation date
7/3/2020 11:15:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1993_1
RECORD_ID
PR0440013
PE
4445
FACILITY_ID
FA0001434
FACILITY_NAME
LOVELACE TRANSFER STATION
STREET_NUMBER
2323
STREET_NAME
LOVELACE
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20406020
CURRENT_STATUS
01
SITE_LOCATION
2323 LOVELACE RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4445_PR0440013_2323 LOVELACE_1993_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
216
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Road) of the existing facility. Almond orchards exist to the southeast of the facility. <br /> Property Acquisition and Access <br /> Theproposed expansion property acquisition area includes a small portion of the open <br /> field to the north (APN: 04-006-017) and 9t acres of the open field to the west (APN: <br /> 204-007-003). The expansion property acquisition to the west includes an existing <br /> gravel road along the west side of the existing facility. This road provides access from <br /> Lovelace Road to the existing chicken brooding operation to the northwest. Alternate <br /> access to this farm operation may already exist from Airport Way on the north side of <br /> the chicken brooding operation. If not,.this access road may need to be relocated to the <br /> west side of the expansion area. Adequate access to the chicken brooding operation <br /> will need to be demonstratedr rior to project construction. Relocation of the access road is not considered a significant environmental or land use impact. Construction <br /> ctivities may be considered a temporary nuisance to the Hayre Farms operation. . <br /> Compensation for property acquisition and impacts, such as a road relocation, are <br /> typically carried out during the appraisal and compensation negotiation between the <br /> County and the individual property owners. San Joaquin County typically purchases <br /> property by informing the owners of their rights to fair compensation, and by paying <br /> the agreed market value for the required property. <br /> If agreement cannot be reached, the County may file a condemnation action in court, <br /> exercising the governments right of eminent domain as provided by the Constitution. <br /> In such a case the court hears testimony relative to the value of the lands the County <br /> wishes to acquire, and determines based on evidence presented by the County and the <br /> land owner,what is fair come ation. Either ay appeal the judges ecisio if <br /> they are dissatisfiedwitha compensation awarde . <br /> Acquisition from either a willing seller or by eminent domain would only affect those <br /> portions of land actually needed for the proposed project, and would not affect the <br /> remainder of the property. <br /> B. ENVIRONMENTAL IMPACTS <br /> The previous section discussed and analyzed the County General Plan, zoning, and <br /> land use compatibility. As a result of that analysis, the project is considered to be <br /> consistent with the General Plan and zoning. <br /> ISSUE: Compatibility with the Goals and Policies of County Plans <br /> Significance: Not Significant. <br /> Mitigation: Not required. <br /> ISSUE: Consistency with zoning <br /> The commitment of agriculturally zoned property,in this case AG-40,is conditionally <br /> allowed for "Ma or Impact Services" uses as described previously. The expansion of the <br /> transfer station facility will be reviewed and analyzed as part of the Use Permit process. <br /> Appropriate Conditions of Approval should be applied to the expansion project. <br /> 4-13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.