Laserfiche WebLink
EXECUTIVE SUMMARY <br /> TABLE S-1 <br /> SUMMARY OF IMPACTS AND MITIGATION MEASURES <br /> LEVEL OF SIGNIFICANCE <br /> ENVIRONMENTAL IMPACT MITIGATION MEASURES AFTER MITIGATION <br /> Land Use <br /> A.1: Implementation of the proposed expansion would Mitigation Measures Proposed as Part of the Project Less than Significant <br /> intensify transfer station operations in the project area,and. A.1a: Transfer station operations on Sundays would be <br /> the increased activity and proposed zoning changes could limited to the acceptance of public self haul waste between <br /> result in land use conflicts with adjacent uses. (Significant) <br /> the hours of 8 a.m.to 4 p.m.,consistent with agreements <br /> between Trinity Community Church representatives and the <br /> applicant. <br /> A.1b: As part of the abandonment of the portion of Faye <br /> Street between Temple Street and Pershing Avenue,a <br /> knuckle would be created at Faye and Temple(see Figure II- <br /> 2),precluding site traffic through the residential area <br /> A.1c: As required under the City zoning ordinance,the <br /> project applicant would erect and maintain a solid masonry <br /> fence a minimum of 6 feet high along the western boundary <br /> of the project site. <br /> Mitigation Measures Identified in This Report <br /> None. <br /> Air Quality <br /> B.1: Fugitive dust generated by construction activities Mitigation Measures Proposed as Part of the Project Less than Significant <br /> would be substantial and would contribute to intermittent <br /> ambient respirable particulate matter concentrations that None. <br /> could violate state PM-10 standards(Significant). <br /> Stockton Scavenger Transfer Station Expansion S.5 ESA/990190 <br />