Laserfiche WebLink
V. IMPACT OVERVIEW <br /> TABLE V-1 <br /> COMPARISON OF THE MITIGATED IMPACTS OF THE PROPOSED PROJECT AND THE ALTENATIVESa <br /> Alternative 1: Alternative 2: Alternative 3: <br /> Impact Proposed Project No Project Reduce-Scale Off-Site <br /> A. Land Use <br /> 1. Implementation of the proposed expansion would LS —N —LS —LS <br /> intensify transfer station operations in the project area, <br /> and the Increased activity and proposed zoning changes <br /> could result in land use conflicts with adjacent uses. <br /> B. Air Quality <br /> 1. Fugitive dust generated by construction activities would LS —N —LS =LS <br /> be substantial and would contribute to intermittent <br /> ambient respirable particulate matter concentrations that <br /> could violate state PM-10 standards. <br /> 2. The project would result in an increase of emissions of LS —N —LS =LS <br /> criteria air pollutants from on-road motor vehicle traffic <br /> traveling to and from the project site and operation of <br /> off-road diesel-powered equipment on the project site. <br /> The increase in emissions could exceed SJVUAPCD <br /> significance criteria for ROG and NO, <br /> Comparisons to Project Comparisons to Setting <br /> + Greater impact than that of the proposed project LS Less than significant adverse impact after mitigation <br /> Lesser impact than that of the proposed project SU Significant and unavoidable adverse impact after mitigation <br /> = Same(or similar)impact as that of the proposed project N No impact or negligible impact <br /> +/= Approximately the same impact as or potentially greater impact than that of the proposed project * Not applicable <br /> —/= Approximately the same impact as or potentially lesser impact than that of the proposed project B Beneficial <br /> ? Magnitude of change relative to the project or level of significance cannot be determined <br /> a Significance levels for the project and the alternatives reflect the levels of significance after mitigation. Symbols indicate maximum impact during construction and operation, <br /> unless otherwise specified. <br /> Stack-ton Scavenger Transfer Station&-pansiotn V.8 ESA/990190 <br />