Laserfiche WebLink
7. Other permits/reviews required by the City, County, State, Federal or other agencies for project <br /> implementation: <br /> Agency: Permits/Reviews: <br /> California Integrated Waste Mgmt. Board (LEA) Solid Waste Facilities Permit <br /> San Joaquin Dept. of Environmental Health Permit to operate refuse vehicles <br /> San Joaquin Valley Unified Air Pollution Ctl Dist. Authority to Construct and Permit to Operate (for tub <br /> grinder and other non-electric equipment <br /> California Water Resources Board Stormwater Discharge General Permit (NPDES) <br /> City of Stockton Building Department Building_permit including approval of fire sprinkler <br /> system plan <br /> City of Stockton Fire Department Permit to store and use flammable and combustible <br /> liquids <br /> 8. Describe proposed General Plan amendments and/or prezoning/rezoning requests: <br /> General Plan Designations Acres Zoning Districts Acres <br /> M-1 to M-2 0.34 <br /> M-1 to M-2 0.30 <br /> M-1 to M-2 5.18 <br /> CM to M-2 2.69 <br /> CM to M-2 0.94 <br /> 9. Describe any site alterations which result from the proposed project: (Address the amount and <br /> location of grading, cuts and fills, vegetation/tree removal, alterations to drainage, removal of <br /> existing structures, etc.) <br /> Cutting andrq ading required for the below-grade roadway past the loadout area 10%grade down <br /> 88% grade ug). A new paved driveway across the currently unpaved storage area west of Pershing <br /> Avenue will increase impervious surface on the site but would not otherwise alter drainage A drain will <br /> connect green waste pad to existing drainage system. <br /> 10. Specific Project Description/Operational Characteristics: <br /> a. Describe Proposed Commercial, Industrial, Institutional, and Recreational Uses (all non- <br /> residential uses): <br /> Receipt of non-hazardous commercial, industrial and residential municipal solid waste and green <br /> waste for the purposes of materials recovery and transfer of wastes to landfill disposal site (See <br /> the Project Description of the SEIR for more information.) <br /> Site Structure Required Parking <br /> (1) Proposed Land Use(s) Zoning Acreage Sg. Ft. Parking Provided <br /> Industrial M-2 11.3a <br /> aIncludes portions of public ways to be abandoned prior to project implementation <br /> (2) Describe project phasing (location/timing): Construction to begin December 1999 or <br /> January 2000 and to be completed within three or four months. <br /> (3) Days/Hours of operation: Monday-Saturday 4 am-5 m: Sunday 8 am-4 pm <br /> (4) Total number of employees/work shifts: 87 / 1 principal shift (office staff [11] on different <br /> schedule from rest of Transfer Station staff) <br /> (5) Number of company vehicles/trucks: 60 <br /> (6)b Estimated number of vehicle trip ends (TE) per day generated by project: <br /> Truck trips 904 TE/Day; Passenger Vehicles, 200 TE/Day; Total, 1.104 TE/Day <br /> bVehicle TE estimates subiect to revision: will be evaluated in the SEIR <br /> (7)` Estimated maximum number of TE/Day based on proposed General Plan Designation: <br /> _TE/Day,and/or Proposed Zoning: TE/Day <br /> These will be evaluated in the SEIR. <br /> 2 <br />