Laserfiche WebLink
(8)d Will land use-related noise produced on site exceed adopted noise standards (Le.: 45 <br /> Leg, dBA during nighttime hours at nearest residential property line; 75 dB LdnICNEL <br /> at nearest commercial property line;and/or 80 LdnICNEL at nearest industrial property <br /> fine)? <br /> Yes— No If yes, describe sources and levels of noise: <br /> d This will be analyzed in the SEIR. <br /> (9) Other operational or design characteristics: <br /> b. Describe Proposed Residential Land Uses: (check as applicable) <br /> Conventional 1-F, 2-F, or 3-F—; PURD _; Condominiums Apartments_; <br /> Dorm itory/Rooming/Boarding Houses—; Elderly Housing —; Mobile Homes—; Motel/Hotel <br /> —; Other <br /> (1) Residential Land Use Summary: <br /> Type of Unit Zoning Acreage Proposed Units Units/Acre Max.Units Allowed Max. <br /> Density <br /> (2) Describe Project Phasing: <br /> (3) Population Projection for Proposed Project: <br /> Projected Population Density(Persons/Unit): <br /> (4) Student Generation Projected for Proposed Project: <br /> Projected Student Density(K-12 Students/Unit): <br /> (5) Estimated total number of vehicle trip ends(TE)per day generated by proposed project: <br /> (6) Estimated maximum number of TE/Day based on proposed General Plan Designation: <br /> TE/Day,and/or Proposed Zoning: TE/Day <br /> 11. Will the project generate any substantial short-term and/or long-term air quality impacts, <br /> including regional/cumulative contributions?e Yes-No ® If so, describe the impacts and <br /> mitigation measures e Air quality impacts will be analyzed in the SEIR. <br /> a. Construction Emissions/Mitigation: Standard construction mitigations (such as watering) should <br /> .mitigate construction emissions. <br /> b. Stationary Source Emissions/Mitigation: Emissions from grinding operations will be anal ed in <br /> the EIR. <br /> c. Mobile Source Emissions/Mitigation: Mobile emissions could be substantial, if distant landfills <br /> are used in the future. <br /> d. Will the project require review and/or permitting by the San Joaquin Valley Air Pollution <br /> Control District? <br /> Yes X No -. Authority to Construct and Permit to Operate may be required for tub grinder and <br /> other equipment. <br /> 3 <br />