My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2000
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
1240
>
4400 - Solid Waste Program
>
PR0440014
>
ARCHIVED REPORTS_2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 3:18:52 AM
Creation date
7/3/2020 11:15:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2000
RECORD_ID
PR0440014
PE
4445
FACILITY_ID
FA0001304
FACILITY_NAME
STOCKTON SCAVENGERS ASSOCIATION
STREET_NUMBER
1240
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
CURRENT_STATUS
02
SITE_LOCATION
1240 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4445_PR0440014_1240 NAVY_.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(8)d Will land use-related noise produced on site exceed adopted noise standards (Le.: 45 <br /> Leg, dBA during nighttime hours at nearest residential property line; 75 dB LdnICNEL <br /> at nearest commercial property line;and/or 80 LdnICNEL at nearest industrial property <br /> fine)? <br /> Yes— No If yes, describe sources and levels of noise: <br /> d This will be analyzed in the SEIR. <br /> (9) Other operational or design characteristics: <br /> b. Describe Proposed Residential Land Uses: (check as applicable) <br /> Conventional 1-F, 2-F, or 3-F—; PURD _; Condominiums Apartments_; <br /> Dorm itory/Rooming/Boarding Houses—; Elderly Housing —; Mobile Homes—; Motel/Hotel <br /> —; Other <br /> (1) Residential Land Use Summary: <br /> Type of Unit Zoning Acreage Proposed Units Units/Acre Max.Units Allowed Max. <br /> Density <br /> (2) Describe Project Phasing: <br /> (3) Population Projection for Proposed Project: <br /> Projected Population Density(Persons/Unit): <br /> (4) Student Generation Projected for Proposed Project: <br /> Projected Student Density(K-12 Students/Unit): <br /> (5) Estimated total number of vehicle trip ends(TE)per day generated by proposed project: <br /> (6) Estimated maximum number of TE/Day based on proposed General Plan Designation: <br /> TE/Day,and/or Proposed Zoning: TE/Day <br /> 11. Will the project generate any substantial short-term and/or long-term air quality impacts, <br /> including regional/cumulative contributions?e Yes-No ® If so, describe the impacts and <br /> mitigation measures e Air quality impacts will be analyzed in the SEIR. <br /> a. Construction Emissions/Mitigation: Standard construction mitigations (such as watering) should <br /> .mitigate construction emissions. <br /> b. Stationary Source Emissions/Mitigation: Emissions from grinding operations will be anal ed in <br /> the EIR. <br /> c. Mobile Source Emissions/Mitigation: Mobile emissions could be substantial, if distant landfills <br /> are used in the future. <br /> d. Will the project require review and/or permitting by the San Joaquin Valley Air Pollution <br /> Control District? <br /> Yes X No -. Authority to Construct and Permit to Operate may be required for tub grinder and <br /> other equipment. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.