Laserfiche WebLink
EXECUTIVE SUMMARY <br /> TABLE S-1 (Continued) <br /> SUMMARY OF IMPACTS AND MITIGATION MEASURES <br /> LEVEL OF SIGNIFICANCE <br /> ENVIRONMENTAL IMPACT MITIGATION MEASURES AFTER MITIGATION <br /> Tragic Circulation and Safety(continued) Mitigation Measures Identified in This Report <br /> None required. <br /> Noise <br /> D.1: Construction associated with the proposed expansion Mitigation Measures Proposed as Part of the Project Given the temporary nature of <br /> of the Stockton Scavenger Transfer Station would construction noise impacts,the above <br /> temporarily and intermittently increase noise levels at nearby None. mitigation measures would reduce the <br /> sensitive receptor locations. (Significant) Mitigation Measures Identified in This Report impact to a less than significant level. <br /> D.la: Construction activities shall be limited to between <br /> 7:00 a.m. and 7:00 p.m.on Mondays through Saturdays. To <br /> avoid disruption of Sunday services at the Trinity <br /> Community Church,construction activities shall be <br /> prohibited on Sundays. <br /> D.lb: Construction equipment noise shall be minimized <br /> during project construction by muffling and shielding <br /> intakes and exhaust on construction equipment(per the <br /> manufacturers' specifications)and by shrouding or shielding <br /> impact tools. <br /> D.lc: The project applicant shall construct the 6-foot high <br /> solid masonry fence proposed along the western boundary of <br /> the site(Mitigation Measure A.1c)prior to construction of <br /> the main transfer station/materials recovery area on the <br /> eastern parcel of the site so as to provide some additional <br /> buffering from associated construction noise. <br /> Storkton Scavenger Transfer Station Expansion S.14 ESA/990190 <br />