Laserfiche WebLink
TABLE 3-1 <br /> CAPITAL COSTS - TRANSFER STATION AND RECYCLING CENTER <br /> ($1,000) <br /> Hydraulic Direct <br /> Item Compaction Dump <br /> Land Acquisition $ 100 $ 100 <br /> Site Preparation (includes foundations) 1,320 1,428 <br /> ( Buildings 285 297 <br /> ` Shop Tools - Spare Parts 16 11 <br /> Rolling Stock (excluding transfer vehicles) 70 105 <br /> Equipment <br /> Vehicle Scales 64 64 <br /> Compactors 88 -- <br /> Chutes, Bins 41 41 <br /> Mechanical 102 102 <br /> Electrical 143 108 <br /> Subtotal $2,229 $2,256 <br /> Contingency @ 10% 223 226 <br /> General Contractor's Fee @ 10% 223 .226 <br /> Engineering @ 10% 223 226 <br /> Finance @ 15% 334 338 <br /> Project Total $3,232 $3,272 <br /> - 11 — <br />