Laserfiche WebLink
TABLE OF CONTENTS <br /> Chapter Page <br /> Number Title Number <br /> List of Tables iii. <br /> List of Figures iv- <br /> List <br /> vList of Appendices v <br /> 1 Project Synopsis 1 <br /> ' 2 Basic Project Parameters 2 <br /> ' 3 Transfer Station and Recycling Center 6 <br /> 4 Transfer Station vs. Direct Haul Analysis 18 <br /> ' 5 Energy Recovery Facility 27 <br /> 6 Master Site Plan 40 <br /> tAppendix A Transfer Vehicle Requirements and Costs 43 <br /> Appendix B Assumptions Used to Calculate Haul Costs 45 <br /> ' and Energy Consumption of Existing Direct <br /> Haul <br /> ' Appendix C Assumptions Used to Calculate Haul Costs 47 <br /> and Energy Consumption with Transfer <br /> Station <br /> Appendix D Letter of Interest from P.G. & E. 48 <br /> ii <br />