Laserfiche WebLink
LIST OF TABLES <br /> Table Page <br /> Number Title Number <br /> 2-1 Estimated Current Composition of 4 <br /> City of Stockton Refuse, Percent <br /> of Weight as Received <br /> 3-1 Capital Costs Transfer Station 11 <br /> and Recycling Center <br /> 3-2 Personnel Requirements - Transfer 12 <br /> Station <br /> 3-3 Annual 0 and M Costs - Transfer 13 <br /> Station <br /> 3-4 Net Annual. Costs - Transfer Station 14 <br /> 3-5 Power Consumption Transfer Station 15 <br /> 3-6 Estimated Vehicles Anticipated at 17 <br /> Transfer Station <br /> 4-1 Direct Haul Cost —Existing Collection 21 <br /> Fleet <br /> 4-2 Haul Cost - Collection Fleet with 22 <br /> Transfer Station <br /> 4-3 Transfer Vehicle Haul Costs 23 <br /> 4-4 Economic and Energy Consumption of 24 <br /> Direct Haul and Transfer Alternatives <br /> 5-1 Basic Design Parameters Package 30 <br /> Incinerator/Power Plants <br /> 5-2 Capital Costs Resource Recovery Facility 32 <br /> 5-3 Personnel Requirements - Resource Recovery 33 <br /> Facility <br /> 5-4 Annual Operating and Maintenance Costs - 34 <br /> Resource Recovery Facility <br /> iii <br />