My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1992-2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30703
>
4400 - Solid Waste Program
>
PR0505006
>
CORRESPONDENCE_1992-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2022 3:53:47 PM
Creation date
7/3/2020 11:16:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1992-2003
RECORD_ID
PR0505006
PE
4445
FACILITY_ID
FA0006475
FACILITY_NAME
TRACY MATERIAL RECOVERY/TRANSF
STREET_NUMBER
30703
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
25313019
CURRENT_STATUS
01
SITE_LOCATION
30703 S MACARTHUR DR
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4445_PR0505006_30703 S MACARTHUR_1992-1997.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
283
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C <br />C <br />Item No. 2 <br />PC: 12-16-93 <br />ER-93-1/UP-93-4 <br />Page 18 <br />Liquids leached from the received wastes and washdown water used for periodic <br />washdown of the transfer station floor shall be directed into holding tanks or lined <br />evaporation ponds. <br />Areas containing equipment shall be curbed to contain petroleum products and hydraulic <br />leaks. Truck washing areas shall be equipped with trench drains to collect waste water. <br />D.2. Potentially Significant Impact: Deqradation or impairment of ground water resources may result <br />from contamination entering the ground water system over the life of the project as a result of the <br />lack or failure of impervious surfaces and liners in working areas. Contamination of a public water <br />supply could occur. <br />Finding: <br />Changes or alterations have been required in, or incorporated into, the project which avoid or <br />substantially lessen the significant environmental effect as identified in the Final EIR. <br />Statement of Fact: <br />This impact will be reduced by the following: <br />Mitigation measures detailed above for mitigating surface water impacts will also provide <br />mitigation for ground water impacts. <br />Personnel working with the "load screening program° and on the "tipping floor' shall have <br />40 hours of OSHA training on spill containment, personal protective equipment, and the <br />handling of recyclable household hazardous materials. <br />An approved hazardous materials storage area shall be provided at the facility for storage <br />of hazardous wastes discovered as a result of load screening and processing. <br />D.3. Potentially Significant Impact: Proiect operations may result in an adverse impact to artificial water <br />carrying structures in particular the Banta-Carbona Irrigation Canal. <br />Finding: <br />Changes or alterations have been required in, or incorporated into, the project which avoid or <br />substantially lessen the significant environmental effect as identified in the Final EIR. <br />Statement of Fact: <br />This impact will be reduced by the following: <br />Erosion control measures shall be implemented as detailed above to minimize soil loss <br />and sedimentation during construction. <br />Unpaved roads and working surfaces shall be watered frequently to minimize dust. <br />
The URL can be used to link to this page
Your browser does not support the video tag.