Laserfiche WebLink
v <br />Item No. 2 <br />PC: 12-16-93 <br />ER-93-1/UP-93-4 <br />Page 20 <br />Statement of Fact: <br />This impact will be reduced by the following: <br />• Daily clean the tipping floor, and periodically steam clean the transfer trailers. <br />F. VISUAL/AESTHETICS <br />F.1. Potentially Significant Impact: Potential litter along the access road surrounding properties, and <br />at the site. <br />Finding: <br />Changes or alterations have been required in, or incorporated into, the project which avoid or <br />substantially lessen the significant environmental effect as identified in the Final EIR. <br />Statement of Fact: <br />This impact will be reduced by the following: <br />0 • Litter shall be picked up regularly from the project site, surrounding properties, and along <br />the approach to the site. <br />CJ <br />