Laserfiche WebLink
Item No. 2 <br />PC: 12-16-93 <br />ER-93-1/UP-93-4 <br />Page 21 <br />ATTACHMENT C <br />MONITORINGMITIGATION PROGRAM <br />TRACY i AND TRANSFER FACILITY <br />(For SignificantImpacts <br />Land Use and Planning Policy <br />Mitigation Measure: If a bird hazard is identified, the applicants will be required to provide <br />mitigation such as netting, a noise system, or other means to ward off birds, as required by the <br />Airport Land Use Commission. <br />Monitoring Requirement: Periodic inspection. <br />Person/Agency Responsible: Airport Land Use Commission. <br />Timing or Frequency of Monitoring: Ongoing. <br />Vegetation and Wildlife Resources 0 <br />Mitigation Measure: Within 20 Not more than 60 days prior to construction, the appliGants shall <br />Mtaia a professional biologist retained by the applicant shall to conduct a preconstruction survey <br />of the site for the presence of the San Joaquin kit fox. If any kit foxes are found, precautions <br />specified in Chapter 4.2, Condition 4.2-4, of the Final EIR shall be taken. <br />Monitoring Requirement: Review of survey results prior to construction. <br />Person/Agency Responsible: San Joaquin County Community Development, California <br />Department of Fish and Game (DFG), U.S. Fish and Wildlife Service. <br />Timing or Frequency of Monitoring: Within 39 60 days of construction. <br />Mitigation Measure: <br />Not more than 60 days prior to construction, a <br />