Laserfiche WebLink
6 0 ft , 4' r, <br />Item No. 2 <br />PC: 12-16-93 i <br />ER-93-1/UP-93'4 <br />Page 25 <br />widening and deepening of the channel adiacent to the project site. <br />Monitoring Requirement: Show on Improvement Plan. <br />Person/Agency Responsible: San Joaquin County CGMMWPity Department Department <br />of Public Works Flood Control Division. <br />Timing or Frequency of Monitoring: Improvement Plan. <br />VISUAL/AESTHETICS <br />Monitoring Measure: Litter shall be picked up regularly from the project site, surrounding <br />properties and along the approach to the site. <br />Monitoring Requirement: Daily litter patrols shall collect project related litter. <br />Person/Agency Responsible: Applicant. <br />Timing or Frequency of Monitoring: Throughout the life of the project. <br />AIR QUALITY <br />Monitoring Measure: Preparation of a PM10 Dust Prevention and Control Plan that includes the <br />dust control measures specified in Chapter 4.7, Condition 4.7-1. <br />Monitoring Requirement: Submit copy of plan. <br />Person/Agency Responsible: San Joaquin Valley Unified Air Pollution Control District. <br />Timing or Frequency of Monitoring: Prior to issuance of building or grading permits. <br />Monitoring Measure: Daily M92911 GIGIAlAcleaning of the tipping floor and periodic steam cleaning <br />of the transfer trailers. <br />Monitoring Requirement: Daily, and as needed to control odor. <br />Person/Agency Responsible: Applicant <br />Timing or Frequency of Monitoring: Throughout the life of the project. <br />