My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1993
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30703
>
4400 - Solid Waste Program
>
PR0505006
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:10 PM
Creation date
7/3/2020 11:16:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1993
RECORD_ID
PR0505006
PE
4445
FACILITY_ID
FA0006475
FACILITY_NAME
TRACY MATERIAL RECOVERY/TRANSF
STREET_NUMBER
30703
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
25313019
CURRENT_STATUS
01
SITE_LOCATION
30703 S MACARTHUR DR
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4445_PR0505006_30703 S MACARTHUR_1993.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
352
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 3 Summary of Significant Impacts and Mitigation Measures <br /> y Sipificant impacts Suggested Afifigafim Mamum <br /> Land Use <br /> Potential bird hazard from on-site The use of netting, a noise system, or other means to ward off <br /> drainage pond to aviation in the area. birds shall be used as required by the Airport Land Use <br /> Commission if a bird hazard is identified. <br /> Vegetation and Wildlife Resources <br /> Potential direct mortality of San Joaquin Conduct preconstruction surveys within 60 days before the start <br /> kit fox during construction and ground of construction, and if any kit foxes are found, undertake <br /> disturbing activities. precautions specified in Chapter 4.2, Condition 4.2-4 of Final <br /> EIR. <br /> Cumulative loss of S n's hawk In carrying out the operations of the project, the applicant shall <br /> foraging habitat. take no actions which violate the provisions of the California <br /> Endangered Species Act or any other laws or regulations <br /> pertaining to the protection of the S n's hawk. <br /> Compliance with said laws shall be the sole responsibility of the <br /> applicant, and the applicant shall agree to indemnify,defend, <br /> and hold the County harmless from and against any claim or <br /> action by affected State agencies as to the project's compliance <br /> with said laws. <br /> Potential disturbance to breeding or Conduct preconstruction surveys for burrowing owl, and avoid <br /> wintering burrowing owls. adverse impacts on burrowing owls, if present, as specified in <br /> Chapter 4.2, Condition 4.2-6, Final EIR. <br /> Geology and Geotechnical <br /> The proposed project would expose Seismic design shall be in accordance with the Uniform Building <br /> workers and project facilities to seismic Code (Seismic Zone 4), as specified in the project's geotechnical <br /> hazards. report contained in Appendix F, Final EIR. <br /> Excavated and fill slopes at the Proper construction practices, according to the geotechnical <br /> proposed project site could fail, causing engineer's recommendations contained in Appendix F, Final <br /> injury, damage to facilities, or burying EIR, shall be followed for all new cuts and fills. In areas <br /> solid waste material. where slopes are steeper than 2:1, the following mitigation <br /> measures shall be implemented: regrade slopes to 2:1 or flatter, <br /> or set back all improvements at least 30 feet from the top and <br /> bottom of the slopes, or erect landslide debris barriers. <br /> Existing surface soils are inadequate to Construction of fills, foundations, slabs, and roadways on the <br /> support foundations for the proposed site shall be in accordance with the geotechnical engineer's <br /> project facilities. recommendations contained in Appendix F, Final EIR. <br /> Construction of the proposed project Placement of plastic sheeting, debris fences,silt fences, and/or <br /> facilities would promote surface soil hay bales to protect disturbed surfaces during precipitation <br /> erosion. events during construction. Following construction, all <br /> disturbed surfaces, especially slopes, shall be revegetated. <br /> I.:/PROJECf/397/MRF1RSI-1.TCY <br /> Revision 1.0 15 December 15, 1993 <br />
The URL can be used to link to this page
Your browser does not support the video tag.