Laserfiche WebLink
Table 3 Summary of Significant Impacts and Mitigation Measures <br /> y Sipificant impacts Suggested Afifigafim Mamum <br /> Land Use <br /> Potential bird hazard from on-site The use of netting, a noise system, or other means to ward off <br /> drainage pond to aviation in the area. birds shall be used as required by the Airport Land Use <br /> Commission if a bird hazard is identified. <br /> Vegetation and Wildlife Resources <br /> Potential direct mortality of San Joaquin Conduct preconstruction surveys within 60 days before the start <br /> kit fox during construction and ground of construction, and if any kit foxes are found, undertake <br /> disturbing activities. precautions specified in Chapter 4.2, Condition 4.2-4 of Final <br /> EIR. <br /> Cumulative loss of S n's hawk In carrying out the operations of the project, the applicant shall <br /> foraging habitat. take no actions which violate the provisions of the California <br /> Endangered Species Act or any other laws or regulations <br /> pertaining to the protection of the S n's hawk. <br /> Compliance with said laws shall be the sole responsibility of the <br /> applicant, and the applicant shall agree to indemnify,defend, <br /> and hold the County harmless from and against any claim or <br /> action by affected State agencies as to the project's compliance <br /> with said laws. <br /> Potential disturbance to breeding or Conduct preconstruction surveys for burrowing owl, and avoid <br /> wintering burrowing owls. adverse impacts on burrowing owls, if present, as specified in <br /> Chapter 4.2, Condition 4.2-6, Final EIR. <br /> Geology and Geotechnical <br /> The proposed project would expose Seismic design shall be in accordance with the Uniform Building <br /> workers and project facilities to seismic Code (Seismic Zone 4), as specified in the project's geotechnical <br /> hazards. report contained in Appendix F, Final EIR. <br /> Excavated and fill slopes at the Proper construction practices, according to the geotechnical <br /> proposed project site could fail, causing engineer's recommendations contained in Appendix F, Final <br /> injury, damage to facilities, or burying EIR, shall be followed for all new cuts and fills. In areas <br /> solid waste material. where slopes are steeper than 2:1, the following mitigation <br /> measures shall be implemented: regrade slopes to 2:1 or flatter, <br /> or set back all improvements at least 30 feet from the top and <br /> bottom of the slopes, or erect landslide debris barriers. <br /> Existing surface soils are inadequate to Construction of fills, foundations, slabs, and roadways on the <br /> support foundations for the proposed site shall be in accordance with the geotechnical engineer's <br /> project facilities. recommendations contained in Appendix F, Final EIR. <br /> Construction of the proposed project Placement of plastic sheeting, debris fences,silt fences, and/or <br /> facilities would promote surface soil hay bales to protect disturbed surfaces during precipitation <br /> erosion. events during construction. Following construction, all <br /> disturbed surfaces, especially slopes, shall be revegetated. <br /> I.:/PROJECf/397/MRF1RSI-1.TCY <br /> Revision 1.0 15 December 15, 1993 <br />