Laserfiche WebLink
Table 3 Continued-Sumomy of Significant Impacts and Mitigation <br /> Water Resources <br /> Surface water contamination may occur Construction of on-site drainage, as proposed. <br /> from discharge of surface waters or <br /> storm waters that have become Evaporation/collection pond for surface runoff form the active <br /> contaminated. working (the yard and wood waste area) shall be lined. <br /> All surface areas involved in the transportation,processing, or <br /> storage of wastes shall be paved or lined and drained to an <br /> appropriate catchment facility to prevent contaminated runoff <br /> from entering the surface and groundwater. <br /> The proposed receiving and processing operations shall take <br /> place within coveredand paved structures. The outdoor wood <br /> and yard waste composting area shall be paved or lined. Except <br /> for yard and wood waste, there shall be no direct precipitation <br /> onto wastes and contamination of surface water. All buildings <br /> shall be constructed so that storm ninoff shall not enter and <br /> come into contact with waste or recovered materials. <br /> Liquids leached from the received wastes and washdown water <br /> used for periodic washdown of the transfer station floor shall be <br /> directed into holding tanks or lined evaporation ponds and then <br /> pumped into trucks for appropriate disposal in accordance with <br /> Federal, State and local requirements. <br /> Areas containing equipment shall be curbed to contain petroleum <br /> product and hydraulic fluid leaks. Truck washing areas shall be <br /> equipped with trench drains to collect waste water. <br /> Degradation or impairment of Mitigation measures detailed above for mitigating surface water <br /> groundwater resources may result from impacts will also provide mitigation for groundwater impacts. <br /> contamination entering the groundwater <br /> system over the life of the project as a Personnel working with the "load screening Program" and on the <br /> result of the lack or failure of "tipping r" shall have 40 hours of OSHA training on spill <br /> impervious surfaces and liners in containment, personnel protective equipment and the handling of <br /> working areas. Contamination of a recyclable household hazardous materials. <br /> public water supply could occur. <br /> An approved hazardous materials storage area shall be provided <br /> at the facility for storage of hazardous wastes discovered as a <br /> result of load screening and processing. <br /> Project operations may result in an Erosion control measures shall be implemented as detailed above <br /> adverse impact to artificial water to minimize soil loss and sedimentation during construction. <br /> carrying structures, in particular the <br /> Banta-Carbona Irrigation Canal. Unpaved roads and working surfaces shall be watered frequently <br /> to minimize dust. <br /> Litter shall be picked up regularly on the site, on surrounding <br /> properties, and along the approach to the facility. <br /> L:/PR0IECT/397/MRF/RS1-1.TCY L <br /> Revision 1.0 16 December 15, 1993 <br />