My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1993
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30703
>
4400 - Solid Waste Program
>
PR0505006
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:10 PM
Creation date
7/3/2020 11:16:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1993
RECORD_ID
PR0505006
PE
4445
FACILITY_ID
FA0006475
FACILITY_NAME
TRACY MATERIAL RECOVERY/TRANSF
STREET_NUMBER
30703
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
25313019
CURRENT_STATUS
01
SITE_LOCATION
30703 S MACARTHUR DR
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4445_PR0505006_30703 S MACARTHUR_1993.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
352
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Parking Areas <br /> Parking for the majority of trucks, trailers and equipment will be in the truck parking <br /> area north of the MRF/Transfer Building as indicated on Figure 3. Employee parking <br /> is available east of the Office/Maintenance Building. Additional paved area west of the <br /> Office/Maintenance is available for parking and storage for containers, bins, etc. <br /> 4. Access <br /> Except for employee traffic, all vehicles will enter and exit the facility at the main <br /> entrance near the north end of the site from McArthur Drive. McArthur Drive is a <br /> County maintained two-lane paved road. <br /> b. Building Floor Plans <br /> A Preliminary Building Floor Plan for the MRF/Transfer Building is shown on Figure 7 and on <br /> Sheet 6 of the Preliminary Development Plans. The area allowed for material processing is on <br /> the west side of the building and consists of equipment including conveyors, sorting stations and <br /> magnetic separator. Material for baling will be directed to the baler pit and conveyor at the <br /> southwest end of the building and loaded for transfer off-site at the loading dock. <br /> Figure 8 and Sheet 7 show the Preliminary Floor Plan for the Office/Maintenance Building <br /> which includes an office and administrative areas and a shop/maintenance area. Four <br /> maintenance bays are provided in addition to a paint booth, parts storage, and a wash area. <br /> C. Traffic Flow Plan <br /> A proposed Traffic Flow Plan is shown on Figure 5 for all the waste unloading and loading <br /> vehicles. All traffic, except employee vehicles, will enter and exit at the main entrance off of <br /> McArthur Drive as indicated on Figure 5. All incoming vehicles will be required to stop at the <br /> Gatehouse for weighing and/or inspection. Exiting vehicles may also be required to stop at the <br /> Gatehouse and be weighed. <br /> L:/PR0JECr/3917/NW/RSI-I.TCY <br /> Revision 1.0 21 December 15. 1993 <br />
The URL can be used to link to this page
Your browser does not support the video tag.