My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1993
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30703
>
4400 - Solid Waste Program
>
PR0505006
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:10 PM
Creation date
7/3/2020 11:16:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1993
RECORD_ID
PR0505006
PE
4445
FACILITY_ID
FA0006475
FACILITY_NAME
TRACY MATERIAL RECOVERY/TRANSF
STREET_NUMBER
30703
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
25313019
CURRENT_STATUS
01
SITE_LOCATION
30703 S MACARTHUR DR
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4445_PR0505006_30703 S MACARTHUR_1993.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
352
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(3) Storagg gf Non-r verable Ruiduals olined for DiSnosal <br /> Non-recyclable material will not be stored longer than 48 hours at the site. The transfer building <br /> tipping floor has capacity to store all non-recyclable materials for 2.9 days. See the Station <br /> Capacity Analysis in Appendix F for the tipping floor storage capacity calculation. All residual <br /> waste storage will be inside the MRF/Transfer Building. <br /> C. Materials Processing and Volume Reduction <br /> (1) Size Reduction QR=fiQns <br /> Except for baling, there will be no size reduction operations at the MRF/Transfer Building such <br /> as shredding. Size reduction win however take place as part of the wood and yard waste <br /> composting operation as described in the Report of Composting Site Information for this facility <br /> included in Section 2 of this Report of Facility Information. <br /> (2) Transformation Processes <br /> There will be no transformation processes at the facility. <br /> (3) Compaction_and/or Baling Qpmfions <br /> A baler is proposed for use at this facility for the baling of paper, cardboard, plastic and <br /> aluminum. The baler proposed is a 2-Rarn Selco Model 2R1050 (50 HP) baler with bales <br /> approximately 45 by 30 by 62 inches in size with a weight of a approximately 900 to 1,600 <br /> pounds, depending on the materials baled. The baler is capable of producing 19 to 33 tons per <br /> hour with an automatic bale strapper. <br /> d. Materials Removal <br /> (1) Recovered Materials Facilities. Procedures. and Frequency of Removal <br /> Baled paper, cardboard, plastic and aluminum will be stored either inside the MRF/Transfer <br /> Building or outside to the-west of the building until transfer off-site to markets. Glass will be <br /> stored in containers or bunkers until,transfer off-site. Each type of material will be shipped <br /> L:/PROJECr/397/NW/RSI1 TCY <br /> Revision 1.0 36 December 15, 1993 <br />
The URL can be used to link to this page
Your browser does not support the video tag.