e) Resulflin a determination by El ® ❑ X <br /> the wastewater treatment <br /> provider which serves or may <br /> serve tkie project that it has <br /> adequate capacity to serve the <br /> projecti-projected demand in <br /> addit'ioii to.the providers <br /> existing commitments? <br /> f) Be served by a landfill with ❑ ❑ X <br /> sufficia1nt•permjtted capacity to <br /> accoint�odate the project''§ <br /> solid Atte disposal need's.? <br /> g) Gomply1with federal, state;anld (� ® X <br /> local statutes and'regulations* <br /> telateCi to solid waste? <br /> Comments: ' <br /> a-e) All water required for facility operations including potable water, is obtained from an onsite <br /> groundwater supply well (EHD Permit#4552)This well was approved by the Environmental <br /> Health Department in 1994.This onsite well also supplies an onsite 150,000 gallon storage <br /> ;tank to satisfy local fire protection requirements.As a Condition of Approval,the <br /> Environmental Health Department Is requiring a yearly permit to operate a public water <br /> system should the number of non-resident individuals exceed 24 for at least 60 days per <br /> ='rybar or if ttie number of service connections exceed four.Therefore any impacts to water <br /> :-supplies mailable to serve the project will be less than significant. <br /> -Sanitary sewer wastes-are collected and dispose of in a subsurface leach field installed on <br /> .., site.The design of this system is per San Joaquin County Public Health Services <br /> , quiremec;}ts:The septic system was approved by the EHD(Permit 4260) in 1995. If the <br /> `existing septic system Is determined to be inadequate during the proposed expansion,then <br /> _...,the_construction of ian Individual.sewage.disposal system(.s.).will be.required at.the time of . <br /> development which meets the requirements of the Environmental Health Department. <br /> :j <br /> For 3torm:drainage,.the facility will operate under a Storm Water Pollution Prevention Plan <br /> filed with California State Water Resources Control.Board.The facility will operate on <br /> concrete or asphalt concrete.Surface water runoff,including all process water,will be <br /> directed td an onsite retention basin by use of a grading design,drain pipes and drainage <br /> ditches,where it will be properly treated, if necessary,to ellfhinate potential environmental <br /> Impacts.Water will be pumped from the retention basin for facility use in operations, <br /> Including fire and dust control.The retention basin has been designed to retain all surface <br /> water runoff resulting from a.1 00 year, 24 hour storm event.Site personnel;will regularly <br /> inspect ani;maintain the storm drains,drainage ditches and basin.The project will.not <br /> inquire new.public utility syi�terns,or district boundary changes.Therefore,:any impacts for <br /> sxorm water discharge will be less than significant. ,, . <br />