My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30703
>
4400 - Solid Waste Program
>
PR0505006
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 5:41:08 AM
Creation date
7/3/2020 11:17:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013
RECORD_ID
PR0505006
PE
4445
FACILITY_ID
FA0006475
FACILITY_NAME
TRACY MATERIAL RECOVERY/TRANSF
STREET_NUMBER
30703
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
25313019
CURRENT_STATUS
01
SITE_LOCATION
30703 S MACARTHUR DR
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4445_PR0505006_30703 S MACARTHUR_2013.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a-e) The applicant indicates the hours of operation for the facility will be Monday-Sunday,24 <br /> hours a day,.seven(7)days a week.The facility will accept.commercial loads from 4:00a.m. <br /> .to 6:00 p.m. and self-haul loads from 6:00 a.m.to 6:00 p.m., Monday through Saturday. <br /> Based on s'proposed volume of 2,500 tons per day of incoming solid waste,a total of 1,727 <br /> vehicles perday,or 1,167 additional vehicles per day are expected. The Department of <br /> Public Works required a Traffic Impact Analysis be prepared to determine traffic impacts on <br /> the level of service for MacArthur Road, Linne Road/MacArthur Road; Linne Road/Chrisman <br /> Road; Linne Road/Corral Hollow Road; and Linne Road/Tracy Boulevard.MRO Engineers <br /> submitted the Final Traffic Impact Analysis to the Public Works Department on December <br /> 17,2008.The analysis and the Public Works Transportation Division determined that any <br /> Impacts toexisting levels of service from the proposed expansion project would be less <br /> thawsignifscant. <br /> The project site boundaries fall within the comprehensive airport land use plan for Tracy <br /> Municipal Airport (TMA). The nearest runway of the TMA is approximately one mile west of <br /> the existing project site.This application is to expand the existing Materials Recover Facility <br /> and a portion of the project fails within the Traffic Pattern Zone for the TMA. The project <br /> sponsor shall abide by the applicable Airport Land Use Plan for Tracy Municipal Airport and <br /> the Federal Airport Administration Advisory Circular No: 150/5200-33B, Hazardous Wildlife <br /> Attractants On or Near Airports. Therefore the proposed expansion project will have less <br /> than a significant.impact on airport imaginary surfaces. <br /> Less Than <br /> ` Significant <br /> Z ,i Potentially With Less Than <br /> Significant Mitigation Significant No <br /> Issues: Impact Incorporated Impact Impact <br /> g,. XVI. UTILITIES ANLI�.SERVIGE SYSTEMS. - <br /> Would,the project:: <br /> a) Exceed wastewater treatment E X. 11 <br /> requirments of the Central <br /> ValleyAegional Water Quality. +' <br /> Control Board?. <br /> b) Require or result in the0 X <br /> construction of new wateror: <br /> ' .. wasteWater treatment facilities <br /> or expMsion of existing ; - <br /> facilities, the construction of <br /> which could cause significant <br /> environmental effects? <br /> C) Require or result in the El ❑ X• El <br /> constr•}iction of new storm <br /> water-drainage facilities or <br /> expansion of existing facilities, <br /> the construction of which could <br /> cause significant environmental <br /> effects? <br /> d) Have gpfficient water supplies � ❑ X � <br /> available to serve the project <br /> from existing gntitiements ano <br /> resources,or are new or,.. <br /> expandpo entitlements <br /> peeded? <br />
The URL can be used to link to this page
Your browser does not support the video tag.