Laserfiche WebLink
NV. <br /> m <br /> �= <br /> +' <br /> l'OrIJ <br /> at' • <br /> ii�'.�•� 1 <br /> pig <br /> • Unpaved Road Speeds:The <br /> construction contractor shall <br /> limit traffic speeds on unpaved <br /> roads to 15 mph. 1 <br /> • Erosion Control:The <br /> construction contractor shall <br /> install gravelbags or other <br /> erosion-control measures to <br /> prevent silt runoff to public <br /> roadways from sites with a <br /> slope greater than 1 percent <br /> during ground-disturbing <br /> activities. <br /> • Wind Breaks:The construction <br /> contractor shall install and <br /> maintain wind breaks at <br /> windward side(s)of <br /> construction areas throughout j <br /> construction activities. <br /> • High Winds:The construction <br /> contractor shall suspend <br /> excavation and grading activity <br /> when winds exceed 20 miles <br /> per hour. <br /> nstruction Equipment <br /> _. off-road construction equipment <br /> used within project area shall conform <br /> to the United States Environmental <br /> Protection Agency s Tier 3 or higher <br /> emissions standards.The construction <br /> contractor shall be made j <br /> aware of this requirement prior to the { <br /> start of construction activities. Use of j <br /> Tier 3 or higher off-road construction 1 <br /> equipment shall be stated on all <br /> grading plans.The construction I <br /> contractor shall maintain a list of all j <br /> operating equipment in use on the <br /> project site.The construction <br /> equipment list shall state the makes, <br /> models, and numbers of construction j <br /> equipment onsite and shall be made <br /> t <br /> available, upon request, to the San j <br /> Joaquin Valley Air Pollution Control I{ <br /> District. , <br /> San Joaquin County PA-0800005\Tracy Material Recovery <br /> Community Development Page 21 <br />