My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30703
>
4400 - Solid Waste Program
>
PR0505006
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 5:41:08 AM
Creation date
7/3/2020 11:17:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013
RECORD_ID
PR0505006
PE
4445
FACILITY_ID
FA0006475
FACILITY_NAME
TRACY MATERIAL RECOVERY/TRANSF
STREET_NUMBER
30703
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
25313019
CURRENT_STATUS
01
SITE_LOCATION
30703 S MACARTHUR DR
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4445_PR0505006_30703 S MACARTHUR_2013.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item No. 2 <br /> PC; 12-16-93 <br /> ER-93-1 NP-93-4 <br /> Page 4 <br /> to actual Final EIR publication. <br /> DETERMINATION OF ADEQUACY OF THE FINAL EIR; <br /> The only determination to be.made by the Commission in order to certify the EIR is whether or not it is <br /> adequate as described in Section 15151 of the CEQA Guideline <br /> should be prepares with a sufficient degs, This section states.in part that'an EIR <br /> ree of analysis to provide decision makers with information which <br /> enables them to make-a decision which ir�el(i e <br /> ntlyevaluation of the environmental effects of a Proposed-project account <br /> not.eiron " stiveCbut the sufficiency An <br /> Of an EIR•is to be reviewed in the light of what is reasonably feasible.• ft is staffs determination that the <br /> EIA meets the intent of this section, The document thoroughly discusses all issues r . - uff�aency <br /> Notice of Preparation, contains all sections required by law,. and adheres to all review " ed' <br /> . presented in the <br /> requirements. All issues raised during the review of.the draft document are thoroughly discussed in the <br /> Final EIR. P ods and time <br />
The URL can be used to link to this page
Your browser does not support the video tag.