Laserfiche WebLink
Adlbk <br /> r <br /> Item No. 2 <br /> PC: 12-16-93 <br /> ER-93-1 NP-93-4 <br /> = Page 21 <br /> ATTACHMENT C <br /> MITIGATION MONITORING PROGRAM FOR THE <br /> TRACY MATERIALS RECOVER AND TRANSFER FACILITY <br /> (For Signirlcant Impacts Only) <br /> Land Use and Planning Policy <br /> Mfi anon Measure: If a bird hazard is identified thea Plicants will be re used <br /> anh as nettin a noise stem or other means to to rov.de <br /> ward off birds as re uired b the <br /> Airpon sucort Land Use Commission <br /> Monitoring Requirement Periodic inspection <br /> Person/Aoency Responsible- qt n Land t iso <br /> Co <br /> t emission <br /> Timing or Fteguency of Monitoring• n <br /> Wooing <br /> Vegetation and Wildlife Resources - <br /> Mitigation Measure: Wit#lfg Not more than 60 days prior to construction <br /> retain a professional biologist retained by the applicant shall to conduct a preco ip rvey <br /> of the site for the presence of the San Joaquin kit fox. If any kit foxes are found, precaut.ons <br /> specified in Chapter 4.2, Condition 4.2-4, of the Final EIR shall be taken. <br /> Monitoring Requirement: Review of survey results prior to construction. <br /> Person/Agency Responsible: San Joaquin County Community Development, California <br /> Department of Fish and Game (DFG), U.S.Fish and Wildlife Service. <br /> Tminq or Frequency of Monitorino: Within 30 60 days of construction. <br /> Depa :14:1 <br /> JOAG111IR Gaul <br /> Mitigation Measure: <br /> Not more than 60 da s rior to construction a <br />