Laserfiche WebLink
Adlikk <br /> Item No. 2 <br /> PC: 12-16-93 <br /> ER-93-1/UP-93-4 <br /> Page 22 <br /> rcfessional biologist retained by the'applicarif shall conduct a preconstnJction survey for the <br /> burrowing owls if present, as specified in Chapter 4.2,'Condition 4.2-6,'of the Final EI R. <br /> Monitoring Requirement: Review of survey results prior to construction. <br /> Person[Agency Responsible: San Joaquin County Community Development Department, <br /> Department of Fish and Game. <br /> Timing or Frequency of Monitoring: Within 60 days*of constniction. <br /> Geology/Geotechnical: <br /> Mitigation Measure: Seismic design shall be in accordance with the.Uniform Building Code <br /> (Seismic Zone 4), as specified in the'project geotechnical repgrt.continued in Appendix F of the <br /> E1R. <br /> Monitoring Requirement: Incorporate Into building plans submitted for plan check prior <br /> to building permit issuance. <br /> Person/Agency Responsible: San Joaquin County'Building Inspection Division. <br /> Timing or Frequency of Monitoring :Prior to issuance of building permits. <br /> Mitigation Measure: All new•cuts and fills shall be consistent with the geotechnical <br /> recommendations contained in Appendix F of the E1R. In areas where slopes are steeper than <br /> 21 the following mitigation measure shall be implemented: regrade slopes to 2:1 or flatter, or <br /> setback all improvements at least 30 feet from the top and bottom of slopes, or erect landslide <br /> debris barriers. <br /> l <br /> Monitoring Requirement: Incorporate into grading plans submitted for plan check prior <br /> to grading permit issuance. <br /> Person/Agency Responsible: San Joaquin County Building Inspection Division. <br /> Timing or Freouency of Monitoring: Prior to issuance of grading permits. <br /> Mitigation Measure: Construction of fills, foundations, slabs and roadways on-site shall be in <br /> accordance with the geotechnical recommendations contained in Appendix F of the E1R. <br /> Monitoring Requirement: Incorporate into building and grading plans submitted for plan <br /> check prior to grading permit issu*anke. ` <br /> i Person/Agency Responsible: San Joaquin County Building Inspection Division, <br /> Timing or Frequency of Monitoring: Prior to issuance of grading and/or building permits• <br /> j <br /> i <br />