Laserfiche WebLink
Item No. 2 <br /> PC: 12-16-93 <br /> ER-93-1/UP-93-4 <br /> Page 23 <br /> Mitigation Measure; Placement of plastic sheeting, debris fences, silt fences, and/or hay bales <br /> to.protect odisfurbed surfaces durjng storms duriri onstruction. Following construction all <br /> disturbed surfaces, especially slopes, shall be revege ated. <br /> Monitoring Requirement; On-site inspection*. <br /> Pe en Responsible: San Joaquin County Community Development Department. <br /> Timina or Freouencv of Monitoring: As necessary during construction, prior to issuance <br /> of Certmcate of Occupancy. <br /> WATER RESOURCES <br /> Mitigation Measure: Construction of on-site drainage . system, as <br /> osed. The <br /> evaporation/collection pond that will collect surface runoff from the active working area of the yard <br /> and wood waste area shall be lined. <br /> Monitoring Rertuirement: Show on Improvement Pian. <br /> Person/Agency Responsible: San Joaquin County Community Development Department <br /> Timing or Frequency of Monitoring: Improvement Plan. <br /> Mitigation Measure:-All'surface areas involved in thetransporting,processing, or storage of waste <br /> shall be paved or fined and drained to a catchment facility. <br /> Monitoring Requirement: Show on improvement Pian. <br /> Person/Agency Responsible: San Joaquin County Community Development Department. <br /> Timing or Frequency of Monito_ring; Improvement Plan. <br /> Mitigation Measure: The proposed receiving and processing operations shall take place within <br /> covered and paved facilities. The outdoor wood and yard waste composting area shall be iinA <br /> aygd. The transfer station building shall be constructed such that storm runoff does not come <br /> into contact with waste or recovered materials. Liquids leached from the received waste and <br /> wash down water shall be directed into holding tanks or lined evaporation ponds. <br /> Monitorin Re uirernent: Show on building plans and on Improvement Plan. <br /> Person/Agency Responsible: San Joaquin County Building Inspection, San Joaquin <br /> County Community Development Department. <br /> Timing or Frequency of Monitoring: Improvement Plan, prior to issuance of Building <br /> Permit. <br />