Laserfiche WebLink
El <br />n <br />Construction & Demolition/Inert Debris Facility Report <br />Tracy Material Recovery and Transfer Facility <br />30703 S. MacArthur Drive, Tracy, California 95377 <br />Schematic Drawing of Buildings and Structures and Operations Area <br />The Site Plans containing, the tentative parcel map, the schematic drawings of <br />buildings and other structures showing the layout and general dimensions of the <br />operations areas, including the unloading, storage and loading areas are <br />provided the Figures section. Complete plans for future buildings and equipment <br />installation will be submitted with the corresponding building permit applications, <br />prior to construction, where applicable. <br />Descriptive Statement of Facility Activity <br />Existing Activities <br />Tracy MRF and TS operates a construction & demolition (C&D) Debris <br />Processing Area adjacent to the Transfer Station building, on the east side on <br />asphalt -concrete surface. The area is a quadrant of a semi -circle with an 80 feet <br />radius comprising an operational area of approximately 2,500 square feet. The <br />facility currently processes up to 175 tons per day (TPD) of mixed C&D per day. <br />An Inert Processing Area is located just west of the compost pad along the <br />access road, in the northwest area of the facility. The size of the pad is 50 feet <br />wide and 200 feet long and does not exceed 20 feet in height with 1:1 side <br />slopes. The total volume of the inert stockpile will not exceed 4,000 cubic yards <br />at any one time. The facility currently processes an average 35 TPD of inert <br />materials per day. <br />Proposed Activities Overview <br />The C&D and Inert (CDI) processing activities proposed at the expanded facility <br />will be phased in, as previously discussed, in accordance with the description of <br />operations and tonnage limits set forth in the following section. and summarized <br />in Table 1: <br />Table 1 - Proposed Activities Overview <br />Phase <br />Average <br />Description <br />Tonnage <br />Inert Debris Recycling expanded to additional one acre <br />1 <br />— <br />200 TPD <br />ad in northwest corner of site. <br />C&D operations area expansion and relocation to <br />1 <br />200 TPD <br />southeast corner of site. <br />(utilizing floor -sort technology) <br />Phase 1 <br />400 TPD <br />Subtotal <br />2 <br />400 TPD <br />Tonnage increase following C&D processing upgrade <br />— <br />utilizin2 mechanized Eick line technology <br />Total <br />600 TPD <br />Combined peak CDI processing capacity <br />2 170.18 CDI FacReport 050813 revised <br />