Laserfiche WebLink
v <br />• <br />Construction & Demolition/Inert Debris Facility Report <br />Tracy Material Recovery and Transfer Facility <br />30703 5. MacArthur Drive, Tracy, California 95377 <br />Facility Operations <br />Unusual Peak Loading Operations Plan <br />Inert Processing <br />The processing equipment can handle peak loading. <br />3- deck Cedar Rapid screen, electric (or <br />Should unusual peak loading occur, the facility can <br />similar <br />operate beyond the peak tonnages to handle disaster <br />debris from emergency events as further described <br />below: <br />Proposed gate operations at 200 TPD with a 250 ton <br />per hour grinder can handle peak tonnages within <br />.75 hours of a 12 -hour operating day. <br />C&D Processing <br />. Phase 1 operations at 200 TPD; with a floor sort, <br />can be processed manually at 20-30 tons per <br />hour. <br />• Phase 2 operations at 400 TPD; with processing <br />capacity of 15 tons per hour (TPH) on pre-sort, <br />and 30 TPH on the C&D Processing Line, <br />provides a capacity of 45 tons per hour, or 540 <br />TPD, where a peak of 400 TPD is being <br />permitted. <br />Emergency Waiver of <br />An emergency waiver of standards is a waiver issued <br />Standards <br />by the LEA which grants a solid waste facility operator <br />temporary relief from specific state minimum standards <br />or specific terms or conditions of a solid waste facility <br />permit. Unusual peak loading could be handled by the <br />facility during an Emergency Waiver of Standards, in <br />the event a state of emergency is declared by the <br />Governor. The waiver will not pose a threat to public <br />health, safety or the environment. The operator intends <br />to operator within the nuisance control measures <br />outlined in Title 14 and provided in LEA Advisory No. <br />41 dated July 14, 1997. <br />Equipment Type and Classification <br />The description of the transfer, recovery and processing equipment, including <br />classification and capacity is provided below. The equipment on-site is provided <br />in Tables 16 and 17. <br />Table 16 - Inert (Type A) Inert Processing Equipment <br />Machinery <br />Machinery Production Rate <br />Portable HSI Lippeman Milwaukee Jaw Plant, <br />250 <br />3- deck Cedar Rapid screen, electric (or <br />Tons/Hour <br />similar <br />32 170.18 CDI FacReport 050813 revised <br />