My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30703
>
4400 - Solid Waste Program
>
PR0505006
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2013_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 8:46:02 AM
Creation date
7/3/2020 11:17:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_2
RECORD_ID
PR0505006
PE
4445
FACILITY_ID
FA0006475
FACILITY_NAME
TRACY MATERIAL RECOVERY/TRANSF
STREET_NUMBER
30703
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
25313019
CURRENT_STATUS
01
SITE_LOCATION
30703 S MACARTHUR DR
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4445_PR0505006_30703 S MACARTHUR_2013_2.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEGATIVE DECLARATION <br />TO: Office of Planning & Research <br />P. O, Box 3044 <br />X_ Sacramento, California 95812-3044 <br />X_ County Clerk, County of San Joaquin <br />FROM: San Joaquin County Community Development Department <br />1810 East Hazelton Avenue <br />Stockton, California 95205 <br />PROJECT TITLE: Use`Permit application NO. PA -0800005 <br />PROPONENT: Tracy Material Recovery, Inc. <br />PROJECT LOCATION:. The project site is located .on the west side of S. MacArthur Drive (APN/Address: <br />253-130-19, 26; 30703'S. MacArthur Drive, Tracy) (Supervisorial District 5) <br />REVISED PROJECT DESCRIPTION: Use Permit application for the expansion of an existing solid waste <br />processing and recycling facility from 39.2 acres to 51.7 acres in two phases over twenty years with a <br />maximum of 1,727 vehicles per day at final build out. Phase 1 to increase the daily waste capacity from <br />1,000 (tpd) to 1,800 (tpd) within ten years'and Phase 2 to increase the daily waste capacity from 1,800 (tpd) <br />to 2,500 (tpd) within twenty years. The project will employ 160 persons and operate 24 hours a day seven (7) <br />days a week. All outdoor processing activities will not begin before 6:00 a.m. and will not operate after 10:00 <br />....._..p..m..on. site activities to include vehicle maintenance, .equipment storage. and truck..parking, construction and <br />demolition of inert debris (cdi), processing wood waste grindings, appliance recycling, and associated waste <br />'handling activites. Proposed site improvements will include: (1) The addition of 19,200 square feet to the <br />existing 57,200 square foot material recovery facility and transfer station building. (2) Addition of 10,500 <br />square feet to the existing maintenance and administration building. (3) Construction of a one (1) mega -watt <br />wood waste bio -mass gasification unit for on-site energy use only. The project site is not under a Williamson <br />Act contract. <br />Based on the attached Initial Study, it has been found that the project will not have a significant effect on the <br />environment. <br />Date: <br />Contact Person: John, L. Funderburg <br />Phone: (209) 468-3160 <br />
The URL can be used to link to this page
Your browser does not support the video tag.