My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30703
>
4400 - Solid Waste Program
>
PR0505006
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2013_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 8:46:02 AM
Creation date
7/3/2020 11:17:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_2
RECORD_ID
PR0505006
PE
4445
FACILITY_ID
FA0006475
FACILITY_NAME
TRACY MATERIAL RECOVERY/TRANSF
STREET_NUMBER
30703
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
25313019
CURRENT_STATUS
01
SITE_LOCATION
30703 S MACARTHUR DR
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4445_PR0505006_30703 S MACARTHUR_2013_2.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item No. 2 <br /> PC: 12-16-93 <br /> ER-93-1/t1P-93-4 <br /> Page 9 <br /> L Landscaping shall be installed in accordance with <br /> te Plan and <br /> Improvement Plan. Landscaping details shall be,consistent with Chapter rproved 9-1 20 of the <br /> Development Title, be included on the Improvement Plan, <br /> issuance of the Certificate of Occupancy for the office/Mainiena ce build aged prior to <br /> 9• Litter shall be picked up on a daily basis on the project site and along the site's frontage <br /> on MacArthur Drive. Litter shall be picked up on surrounding properties as needed. <br /> h• Except.for the wood and yard waste composting operations, all waste ha <br /> transfer operations shall take place within thea ndling and <br /> ppraved transfer building. <br /> i• All doors,windows,and unscreened openings at the transfer building shall remain closed <br /> unless in actual use. <br /> 1• All neve cuts and .fills shall be consistent with the geotechnical recommendations <br /> contained in Appendix F of the Final EIR. In areas where slopes are steeper than 2:1, the <br /> following mitigation measure shall be implemented: Degrade slopes to 21 or flatter, or se <br /> back all improvements at least 30 feet from the top and bottom of slopes, or erect <br /> landslide debris barriers. <br /> k. Construction of fills,foundations,slabs, and roadways-on the site shall be in accordance <br /> with the geotechnical recommendations contained in Appendix F of the Final EIR. <br /> 1• Placement of plastic sheeting,debris fences, silt fences, and/or hay bales shall be utilized <br /> to protect disturbed surfaces during storms during construction activities. Following <br /> construction, all disturbed surfaces, especially slopes, shall be revegetated. <br /> M. The area where the windrows will be located for the outdoor wood and yard waste <br /> composting shall be paved. <br /> n. Personnel working with the°load screening program'and on thetipping floor shall have <br /> 40 hours of OSHA training on spill containment, personal protect <br /> handling of recyclable household hazardous materials. ive equipment, and the <br /> 0. Any mitigation monitoring done by the Community Development Department shall be <br /> done on a time and materials basis paid for by the applicant. <br /> 2 AlR POLLUTION CONTROL DISTRICT: <br /> a• A PM10 Dust Prevention and Control Plan shall be prepared that includes the dust control <br /> measures specified in Chapter 4.7, Mitigation 4.7-1, of the Final EIR. <br /> b• A Standard Operating Procedure (SOP) shall be developed to address the elimination of <br /> the generation and emission of odgrs as much as possible. The SOP shall include <br /> measures to allow for the shortest possible holding time of waste brought to the facility, <br /> as well as contingency <br /> 9 cy measures in the event of excess o <br /> complaint. dor generation anal/or nuisance <br /> - <br />
The URL can be used to link to this page
Your browser does not support the video tag.