My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30703
>
4400 - Solid Waste Program
>
PR0505006
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2013_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 8:46:02 AM
Creation date
7/3/2020 11:17:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_2
RECORD_ID
PR0505006
PE
4445
FACILITY_ID
FA0006475
FACILITY_NAME
TRACY MATERIAL RECOVERY/TRANSF
STREET_NUMBER
30703
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
25313019
CURRENT_STATUS
01
SITE_LOCATION
30703 S MACARTHUR DR
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4445_PR0505006_30703 S MACARTHUR_2013_2.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Item No. 2 <br /> PC: 12-16-93 <br /> ER-93.1/UP-93-4 <br /> Page 10 <br /> C. The tipping floor area and transfer trailers-shall be cleaned d`ailjr. Transfer trailers shall <br /> be periodically steam cleaned to remove accumulated grease and dirt. <br /> 3. DEPARTMENT OF FISH AND GAME: <br /> a. In carrying out the operations of the project, the applicant shall take no actions that <br /> violate the provisions of the State or Federal Endangered Species Acts or any regulations <br /> promulgated pursuant thereto. Compliance with.said laws shall be the sole responsibility <br /> of the applicant, and the applicant shall agree to indemnify,defend, and hold the County <br /> harmless from and against any claim or action by affected State or Federal agencies as <br /> to the project's compliance with said laws. <br /> b. Not more than 60 days prior to construction, a professional biologist retained by the <br /> applicant shall conduct a preconstruction survey of the site for the Presence of the San <br /> Joaquin kit fox. If any kit foxes are found,precautions specified in Chapter 4.2, Mitigation <br /> 4.2-4, shall be taken. <br /> C. Not more than 60,days prior to construction, a-professional biologist retained by the <br /> Aim applicant shall conduct a preconstruction survey of the site for the presence of Burrowing <br /> owls and avoid adverse impacts on Burrowing owls, if present, as specified in Chapter <br /> 4.4.Mitigatien 4.2-6. <br /> 4. DEPARTMENT OF PUBLIC WORKS: <br /> a. The driveway approaches with a right tum lane at the north entrance shall be improved <br /> in accordance with the requirements of San Joaquin County Standards R-17 and R-27 <br /> prior to issuance of the occupancy permit (Development Title Section 9-1145.5) <br /> b. Dedicate a 42-foot-wide right-of-way from the centerline of MacArthur Drive to the property <br /> line along the frontage of APN 253-130-19. (Development Title Section 9-1150.2) <br /> C. MacArthur Drive from the south driveway to Linne Road shall be upgraded structurally to <br /> provide for the difference between the present Traffic Index and the Traffic Index for the. <br /> proposed development. The upgrade shall be constructed in conformance with the <br /> Improvement Standards and Specifications of the County of San Joaquin. All <br /> improvement plans and specifications must be approved by the County of San Joaquin <br /> CL M u.� Department of Public Works prior to approval of the Improvement Plan. (Development <br /> Title Section 9-1150.4 <br /> d. An encroachment permit shall be required for work within-the road right-of-way. <br /> (Development Title Section 9-1145.2) <br /> The Traffic Impact Mitigation Fee will be required for this development. The fee is due <br /> and payable prior to the time of building permit application. Eighty percent of the fee- <br /> may be deferred over a period not to exceed five years by entering into a Deferred Traffic <br /> Impact Mitigation Fee Payment Agreement with the County. If deferred, the initial <br /> _ payment is-20 percent of the total fee based on$249.99 per daily trip-end generated in <br />
The URL can be used to link to this page
Your browser does not support the video tag.