Laserfiche WebLink
Ask <br /> r <br /> Item No. 2 <br /> PC: 12-16-93 <br /> ER-93-1/UP-93-4 <br /> _ . Page 21 <br /> ATTACHMENT C <br /> MITIGATION MONITORING PROGRAM FOR THE <br /> TRACY MATERIALS RECOVER AND TRANSFER FACILITY <br /> (For Significant Impacts Only) <br /> Land Use and Planning Policy <br /> Miti ation Measure: If a bird hazard is identified the a licants will be re uired toprovide <br /> miti anon such as netting- a nolse stem or other means to ward off birds as re uired b the <br /> Airport Land Use Commission <br /> Monitoring Requirement_ Periodic inspection. <br /> Person en Responsible- Airoort i ani i ire <br /> Timing or Ftepuencv of Monitoring• Ongoing <br /> Vegetation and wiirilrfe ResoumeS - <br /> Mitigation Measure: l;a Not more than 60 days prior to construction <br /> hq <br /> k4ain a professional biologist retained by the applicant shall to conduct a preco{ n �o survey <br /> of the site for the presence of the San Joaquin kit fox. if any kit foxes are found, precautions <br /> specified in Chapter 4.2, Condition 4.2-4, of the Final EIR shall be taken. <br /> Monitoring Requirement: Review of survey results prior to construction. <br /> Person/Agency Responsible: San Joaquin County Community Development, California <br /> Department of Fish and Game (DFG), U.S.Fish and Wildlife Service. <br /> Timing or Frequent , of Monitoring: Within 39 60 days of construction. <br /> Depa <br /> Mitigation Measure: <br /> GGRG <br /> Not more than 60 da s riot to construction a <br />