Laserfiche WebLink
Item No. 2 <br /> -- PC: 12-16-93 <br /> ER-93-1/UP-93-4 <br /> s Page 22 <br /> Professional biologist retained by the'appiicarit shell conduct a preconstruction surrey for the <br /> burrowing owls if present,'as specified in Chapter 4.2,Condition 4.2-6, 'of the Final EIR. <br /> Monitoring Requirement: Review of survey results prior to construction. <br /> Person/Agena Responsible; San Joaquin County Community Development Department, <br /> Department of Fish and Game. <br /> Timing or Frequency of Monitoring: Within 60 days'of construction. <br /> Geology/Geotechnical: <br /> Mitigation Measure: Seismic design shall be in accordance with the:Uniform Building Code <br /> (Seismic Zone 4), as specified in the project geotechnical repgrt.continued in Appendix F of the <br /> EIR. <br /> Monitoring Requirement: Incorporate into bulging plans submitted for plan check prior <br /> to building permit issuance. <br /> Peisoii/Agency Responsible: San Joaquin Cbunty Building Inspection Division. <br /> Timing or Frequencv of Monitoring: .-Prior to issuancq of building permits. <br /> L <br /> Mitigation Measure: All new.cuts and fills shall be consistent with the geotechnical <br /> recommendations contained in Appendix F of the EiR. In areas where slopes are steeper than <br /> 2:1 the following mitigation measure shall be implemented: regrade slopes to 2:1 or flatter, or <br /> setback all improvements at least 30 feet from the top and bottom of slopes, or erect landslide <br /> debris barriers. <br /> Monftodnq Requirement: Incorporate into grading plans submitted for plan check prior <br /> to grading permit issuance. <br /> Person/Agency Responsible: San Joaquin County Building Inspection Division. <br /> Timing or Frequency of Monitoring: Prior to issuance of grading permits. <br /> Mitigation Measure: Construction of fills, foundations, slabs and roadways on-site shall be in <br /> accordance with the geotechnical recommendations contained in Appendix F of the EIR. <br /> Monitoring Requirement: Incorporate into building and grading plans submitted for plan <br /> check prior to grading permit issuance: <br /> S <br /> i Person/Agency Responsible: San Joaquin County Building Inspection Division. <br /> Timing or Frequency of Monitoring: Prior to issuance of grading and/or building permits. <br /> i <br />