My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30703
>
4400 - Solid Waste Program
>
PR0505006
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2013_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 8:46:02 AM
Creation date
7/3/2020 11:17:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_2
RECORD_ID
PR0505006
PE
4445
FACILITY_ID
FA0006475
FACILITY_NAME
TRACY MATERIAL RECOVERY/TRANSF
STREET_NUMBER
30703
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
25313019
CURRENT_STATUS
01
SITE_LOCATION
30703 S MACARTHUR DR
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4445_PR0505006_30703 S MACARTHUR_2013_2.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t 0. <br /> Item NO. 2 <br /> PC: 12-16-93 <br /> ER-93-1/UP_93:,4 <br /> Page 25 <br /> widenin and dee enin of the channel ad'acent to the ro'ect site. <br /> Mgakt fng Requirement: Show on Improvement.Plain. <br /> Person Agency Res❑nnsible: San Joaquin County <br /> of Public Works Flood Control Division. ' a �epa� Merit <br /> Timirig or Freouency of MonitOrinq: Improvement Flan. <br /> VISUAVAESTHETICS <br /> Monitoring Measure: Litter shall be-picked up regularly from the pro ect site <br /> Properties'and along the approach to the site, j , surrounding <br /> Monitoring Requirement: Daily litter patrols shall collect project related litter. <br /> Person/Aoenc� RQ���..��� Applicant. <br /> vuo,UIC• <br /> Timing orFreauenr .Of eegnit,.____ <br /> ����� ►>>- Throughout.the life of the project. <br /> AIRa <br /> Ms :. Preparation Of a PM1 p Dust Prevention and Control Plan that i l <br /> onitoring Meaure <br /> dust control measures specified in Chapter 4.7, Condition 4.7-1. ncludes the <br /> Monitorino Renuirement: Submit copy of plan <br /> Person Agency Responsible: San Joaquin Valley Unified Air Pollution Control District. <br /> Timing or Frequence of Monitoring: Prior to Issuance of buil ding or grading g permits. <br /> Monitorino Measure: Daily wash-doves cleaning Of the tipping floor and periodic steam cleaning <br /> Of the transfer trailers. -- pp g 9 <br /> Monitoring Requirement: Daily, and as needed to control odor. <br /> Person Agency Responsible: Applicant <br /> Timing or Frequency of Mona„ring: Throughout the life of the project <br />
The URL can be used to link to this page
Your browser does not support the video tag.