Laserfiche WebLink
Item No. 2 <br /> PC: 12-16-93 <br /> ER-93-1/UP-93-4 <br /> Page 24 <br /> _Monftorin •Measure: Areas-containing equipment°shalF be curbed to contain petroleum prdduct <br /> and hydraulic fluid leaks. Truck washing areas shall be equipped with trench drains to collect <br /> waste water. <br /> Monitoring Requirement: Show on Improvement Plan, <br /> Person/Agency Responsible: San Joaquin County Community Development Department <br /> Timing or Frequency of Monitoring: Improvement Plan. <br /> Monitorinq Measure: Personnel working with the'load screening program' and on the 'tipping <br /> floor' shall have 40 hours.of OSHA training on spill containment,Petsonal protective equipment, <br /> - and the handling of recyclable household hazardous materials. <br /> Monitoring Requirement: Show on Improvement'Plan. <br /> Person/Agency Responsible: San Joaquin County Public Health Services and Cal OSHA. <br /> Timing or Frequency of-Monitoring: .Prior to operations. <br /> MonitoringMeasure: An approved hazardous materials storage area(s)•shall be provided at the ' <br /> facility for storage of hazardous wastes discovered as a result of load screening and processing. <br /> Monitoring Requirement: Show on Improvement Plan. <br /> Person/Agency Responsible: San Joaquin County Public Health Services, San Joaquin <br /> County Community Development Department <br /> Timing or Frequency of Monitoring: Improvement Plan. <br /> Monitoring Measure: Unpaved roads and working surfaces shall be watered frequently to <br /> minimize dust. <br /> Monitoring Requirement: Regular sprinkling of roads and working surfaces during <br /> construction. <br /> Person/Agency Responsible: San Joaquin Valley Unified Air Pollution Control District. <br /> Timing or Frequency of Monitoring: Throughout construction phase. <br /> Monitoring Measure: *Berms or other measures'shall be utilized to prevent a'i 00 year 24 hour <br /> flood in Corral Hollow Creek from accidently overflowing into the pit An acceptable alternative <br /> to the construction of berms would be that the prosect applicant provide an analysis of Corral <br /> Hollow Creek forthe 100-year/24-hour storm event to determine the likelihood of overtopping and <br /> diverting into the pit Should overtopping prove to be a likely event, the proiect applicant would <br /> then be required to submit to the reviewinq agency an engineered plan for prevention of said <br /> " _ overtoppinq. Acceptable mitigations would include the construction of berms or levees or the <br />