My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1994
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0517379
>
ARCHIVED REPORTS_1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:09 PM
Creation date
7/3/2020 11:19:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1994
RECORD_ID
PR0517379
PE
4466
FACILITY_ID
FA0007101
FACILITY_NAME
FORWARD INC LANDFILL
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
02
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4466_PR0517379_9999 S AUSTIN_1994.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Alternative 4. Aerated Static Pile/Windrow <br /> This alternative utilizes a combination of two separate composting technologies, aerated <br /> static piles and compost windrows using a windrow turning machine. The combined maxi- <br /> mum daily load capacity for both composting facilities is 1,000 TPD. <br /> The maximum daily load capacity of the aerated static pile compost facility is 300 TPD. <br /> This capacity is based on the following assumptions: <br /> • Five-day per week operations <br /> • Approximately 5 acres for composting piles <br /> Extended aeration aerated static pile with individual compost cells 15 feet <br /> wide at the base and 75 feet long <br /> • Base depth 1-foot deep <br /> • Blanket cover 1-foot deep <br /> • Overall pile height is 8 feet <br /> • Composting period is projected to be 4 to 12 weeks depending on product <br /> desired <br /> • Aeration fan is 400 cfm per compost cell <br /> • Biofilter sized for 3 cfm/ft2 <br /> • 40 percent volume reduction after composting <br /> The maximum daily load capacity of the Windrow compost facility is 700 TPD. This <br /> capacity is based on the following assumptions: <br /> • Five-day per week operations <br /> • Approximately 10 acres for compost Windrows <br /> • Windrows are 18 feet wide at the base with 8 feet between Windrows for <br /> water addition and fire control <br /> • Windrows are 8 feet high <br /> ' a aIOO29M3.wps/lo <br /> 9/28/94 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.