My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1994
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0517379
>
ARCHIVED REPORTS_1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:09 PM
Creation date
7/3/2020 11:19:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1994
RECORD_ID
PR0517379
PE
4466
FACILITY_ID
FA0007101
FACILITY_NAME
FORWARD INC LANDFILL
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
02
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4466_PR0517379_9999 S AUSTIN_1994.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> iAlternative 2. Windrow Composting Using a Windrow Turning Machine. <br /> The maximum daily load capacity of the Windrow Compost Facility using a windrow <br /> turning machine is 1,100 TPD. This capacity is based on the following assumptions: <br /> • Five-day per week operations <br /> Approximately 15 acres for compost Windrows <br /> • Windrows are 18 feet wide at the base with 8 feet between Windrows for <br /> water addition and fire control <br /> i • Windrows are 8 feet high <br /> i • Composting period is projected to be 4 to 12 weeks depending on product <br /> desired <br /> • 40 percent volume reduction after composting <br /> Alternative 3. Aerated Static Pile <br /> The maximum daily load capacity of the aerated Static Pile Compost Facility is 750 TPD. <br /> This capacity is based on the following assumptions: <br /> i • Five-day per week operations <br /> i • Approximately 12 acres for composting piles <br /> • Extended aeration aerated static pile with individual compost cells 15 feet <br /> iwide at the base and 75 feet long <br /> • Base depth 1-foot deep <br /> • Blanket cover 1-foot deep <br /> i • Overall pile height is 8 feet <br /> • Composting period is projected to be 4 to 12 weeks depending on product <br /> desired <br /> • Aeration fan is 400 cfm per compost cell <br /> ® <br /> Biofilter sized for 3 cfm/ft2 <br /> i ® 40 percent volume reduction after composting <br /> a ea10029B63."5/9 <br /> 9/2s/% 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.