Laserfiche WebLink
17. Local Enforcement Agency(LE,.;,, Jitions: <br /> 1. The design and operation of this facility must comply with all applicable State Minimum Standards for solid waste handling as <br /> specified in Title 14,California Code of Regulations. <br /> 2. The operator shall maintain a log of special/unusual occurrences. This log shall include,but is not limited to,fires,explosions, <br /> the discharge and disposition of hazardous or un-permitted wastes,and significant injuries,accidents or property damage. Each <br /> log0 entry shall be accompanied by a summary of any actions taken by the operator to mitigate the occurrence. The log shall be <br /> available to site personnel and the EA at all times. <br /> 3. The operator shall comply with all waste discharge requirements,Clean-up and Abatement Orders,monitoring,remediation <br /> schedules and related requirements of the local California Regional Water Quality Control Board(CRWQCB). Degradation of <br /> water connected to this site shall be remediated in the manner specified y the CRWQCB. <br /> 4. Additional information concerning the design and operation of this facility must be furnished upon the request of the LEA. <br /> 5. Forward Resource Recovery Facility must comply with the conditions of approval of Use Permit UP-00-07. , <br /> 6. The LEA reserves the right to suspend or modify waste receiving and handling operations when deemed necessary due to an <br /> emergency,a potential health hazard,or the creation of a public nuisance. <br /> 7. Any change that would cause the design or operation of the facility not to conform to the terms and conditions of this permit is <br /> prohibited. Such a change may be considered a significant change,requiring a permit revision. In no case shall the operator <br /> implement any change without first submitting a written notice of the proposed change,in the form of an RFI amendment,to the <br /> LEA at least ISO days in advance of the change. <br /> 8. A change in operator for this site will require a new solid waste facility permit. The LEA shall be notified in writing of any <br /> change in ownership or operator of the facility. <br /> 9. The facility shall meet the design and operational standards of the California Code of Regulations,Title 14(CCR 14),Sections <br /> 17400-17564,and Title 14(CCR 14),Sections 17850-17870. <br /> 10. The transfer station facility shall maintain and keep all stockpiles under 12 feet in height within the transfer building. <br /> 11. Physical Contaminants and refuse removed from feedstock,compost,or chipped and ground material shall be removed from the <br /> site within 7 days and transported to a disposal facility. <br /> 12.. All stockpiling of compostable organic material for a combined period of time greater than six months is considered disposal and <br /> must be either removed from the site or processed for composting operations. <br /> 13. Wastewater shall not be allowed to discharge off the property or into any waterway except as allowed by NPDES permit. <br /> 14. All incoming waste shall be inspected for hazardous waste. If hazardous waste is found it shall be handled as hazardous waste in <br /> accordance with all applicable State standards. <br /> 15. In accordance with Title 14(CCR 14),Section 17867.5. Operators shall ensure that all personnel assigned to the operation shall <br /> be trained in subjects pertinent to operations and maintenance,physical contaminants and hazardous materials recognition and <br /> screening,with emphasis on odor impact management and emergency procedures. A record of such training shall be maintained <br /> on the site. All personnel working with the load screening program shall be trained to recognize hazardous wastes,and shall be <br /> trained for safety and evacuation procedure <br /> 16. This permit is subject to review by the LEA and may be modified,suspended,or revoked for sufficient cause following a hearing. <br /> 17. Wastes to be composted must go directly into composting operation and may not be stockpiled on site for more than seventy-two <br /> (72)hours.—PCS I :5a;J, ho 5JVCkFV't -b CCCA'r <br /> 18. Leachate control is required. <br /> 19. EHD must be notified in writing three(3)daMi"Drior to new feed stock material beinc,adde)or changed. <br /> Page 4 of 5 <br />