My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0517379
>
ARCHIVED REPORTS_2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 12:45:22 AM
Creation date
7/3/2020 11:19:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2009
RECORD_ID
PR0517379
PE
4466
FACILITY_ID
FA0007101
FACILITY_NAME
FORWARD INC LANDFILL
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
02
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4466_PR0517379_9999 S AUSTIN_2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
As described above in this section, the composting pad will be constructed of native earth. <br /> The permeability of soils below the surface of the composting pad is low. Operations will be <br /> suspended if necessary during periods of wet weather to prevent damage to the <br /> composting pad or the surface will be paved with gravel or asphalt if the economics justify <br /> the higher cost. Due to the low permeability of native soils and depth to groundwater, <br /> monitoring of soil moisture is not warranted. Soil sampling for ammonia, nitrates, metals <br /> and trace organics could be conducted to confirm the lack of movement of these <br /> constituents. Given the slow annual movement of groundwater at this site, soils could be <br /> removed and disposed of if movement of pollutants was found through soil monitoring. <br /> 2.1.8 Leachate Control <br /> If leachate generation is expected, provide a schematic drawing of the leachate collection <br /> and removal system. If necessary, indicate the location of drainage blankets, piping, <br /> drainage swales, collection points, etc. <br /> Describe the method of monitoring, collection, treatment, and disposal. <br /> Note: (1) Facilities that use amendments or additives in their composting operations <br /> shall include in their active composting areas a compost leachate management control <br /> system which is designed to contain and collect twice the anticipated volume of compost <br /> leachate, and the precipitation from a 25 year, 24-hour rainstorm event, and <br /> (2) Shall have leachate holding facilities with a liner with a permeability of no greater <br /> than 1 x 106 cm/sec, which is constructed of a thickness and type of material that is <br /> resistant to damage due to weather or machinery, other standard allowed in writing by <br /> the regional board. <br /> Because additional water will only be applied to the compost when necessary for <br /> maintaining adequate internal moisture, significant leachate generation is not <br /> anticipated. As stated in Section 3.5.3, the site is in a region of net evaporation. <br /> Additionally, compost windrows typically form a light crust on the outside, which <br /> repels rainfall. The site's drainage control system was designed to handle all runoff <br /> from a 25-year, 24-hour storm, including runoff from the compost piles. This system <br /> is illustrated in Figure 9 and design calculations are attached in Appendix B. <br /> a. Leachate Barriers <br /> If leachate barriers are proposed, describe their length, width, depth, and design <br /> characteristics. <br /> There are no leachate barriers currently proposed for the site. <br /> b. Leachate Barrier Locations <br /> Show the locations of leachate barriers on the plot plan. Indicate <br /> whether leachate barriers are in place or to be installed. <br /> There are no leachate barriers currently proposed for the site. <br /> Forward Composting Facility <br /> Z:\PROJECTS\Allied Waste\Forward\Resource Recovery Facility\Permitting Services\2009 RCSI\RCSI Final 031609.doc; <br /> Page 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.