Laserfiche WebLink
C. Monitoring and Sampling Procedures <br /> Describe monitoring and sampling procedures. <br /> There are no leachate monitoring and sampling procedures proposed for the facility. Run- <br /> off will be collected in a retention pond located in the southwest corner of the site. Runoff <br /> will be sampled and monitored to meet pretreatment requirements or the site's Storm <br /> Water Pollution Prevention Plan and Storm Water Monitoring Plan depending on final <br /> disposal of collected water. <br /> d. Leachate Volume <br /> Estimate the volume of leachate to be handled and the manner of removal from the <br /> control barrier system (periodic pumping, etc.). <br /> As discussed previously, significant leachate generation is not anticipated. <br /> e. Treatment, Storage and Discharge <br /> Indicate the manner of treatment, storage and point of discharge of treated leachate. <br /> Water collected in the retention ponds will either be evaporated, used during the <br /> initial mixing of the compost, used for dust control, discharged to the South Fork, <br /> pumped to the on-site leachate evaporation pond, or transported to a municipal treatment <br /> works depending on the quality and quantity of collected water. Water used in the <br /> initial mixing of the compost will bring the water content of the compost to proper <br /> levels. <br /> f. Landfill Sites <br /> For landfill sites, describe or show on the plot plan the location of current and <br /> past control and monitoring facilities. <br /> Forward does not plan to locate the Compost Facility on an existing or closed refuse fill <br /> area. <br /> 2.1.9 Site Access <br /> Provide a schematic drawing that displays access to the site, traffic routing, stacking <br /> lanes, loading and unloading areas, storage and processing areas, parking, provisions <br /> for turns across traffic, gate locations, traffic routing onsite, etc. <br /> The main entrances to the landfill and RRF and the main internal road at the landfill are <br /> paved. Other roads used at the site are either gravel (if they will be used often or in the <br /> near future) or dirt. Onsite roads are constructed as needed. These onsite roads will be <br /> constructed with onsite soils, crushed asphalt or aggregate, or both. The roads are <br /> maintained by site personnel. Since the roads and entrance facilities area are not <br /> paved, there is no thorough cleaning. Litter is raked/picked up. Dirt tracked onto Austin <br /> Forward Composting Facility <br /> Z:\PROJECTS\Allied Waste\Forward\Resource Recovery Facility\Permitting Services\2009 RCSI\RCSI Final 031609.doc; <br /> Page 23 <br />