My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0517379
>
ARCHIVED REPORTS_2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 11:24:49 AM
Creation date
7/3/2020 11:19:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014
RECORD_ID
PR0517379
PE
4466
FACILITY_ID
FA0007101
FACILITY_NAME
FORWARD INC LANDFILL
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
02
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4466_PR0517379_9999 S AUSTIN_2014.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. The geosynthetic clay liner shall not be installed on an excessively moist subgrade <br /> or on standing water. The geosynthetic clay liner shall be installed in a way that <br /> prevents hydration prior to completion of construction of the liner system. <br /> F. The geosynthetic clay liner shall not be installed during precipitation or other <br /> conditions that may cause hydration of the geosynthetic clay liner. <br /> G. The geosynthetic clay liner shall be installed as shown on the Construction <br /> Drawings, or as otherwise indicated by the Manufacturer, if approved by the QA/QC <br /> CONSULTANT. <br /> H. Geomembrane installation shall immediately follow the geosynthetic clay liner <br /> installation. All geosynthetic clay liner that is placed during a day's work shall be <br /> covered with geomembrane before the GEOSYNTHETICS CONTRACTOR leaves <br /> the site at the end of the day. <br /> I. Geomembrane shall not be placed on a geosynthetic clay liner that is hydrated. <br /> J. All geomembrane seams shall be welded after each geomembrane panel is placed <br /> over the geosynthetic clay liner. Heat sealing of seams for geomembrane placed <br /> over GCL alone is not acceptable. <br /> K. All geomembrane defects and destructive sample locations shall be immediately <br /> repaired. <br /> M. All hydrated geosmthetic clay liner shall be removed and replaced by the <br /> GEOSYNTHETICS CONTRACTOR at no additional cost to the OWNER. <br /> Hydrated GCL is defined as material that has become soft as determined by <br /> squeezing the material with finger pressure, material that has exhibited swelling, or <br /> material that has a moisture content greater than 100 percent as determined by <br /> ASTM D2216 or ASTM D4643. Cause for replacement of the GCL due to <br /> exposure to moisture and subsequent hydration shall be determined at the QA/QC <br /> CONSULTANT's sole discretion. <br /> 3.6 SEAMS AND OVERLAPS <br /> A. On slopes steeper than 10 horizontal to 1 vertical, all geosynthetic clay liners shall <br /> be continuous down the slope; that is, no horizontal seams shall be allowed on the <br /> slope. <br /> B. No horizontal seams shall be allowed on the base and the crest of the landfill within <br /> 5 ft(1.5 m)of the toe or the crest of the slope. <br /> C. All geosynthetic clay liners shall have overlapped seams. Along the length (i.e., the <br /> sides) of the mat, the overlap shall be 12 in minimum. Along the width (i.e., the <br /> ends)of the mat,the overlap shall be 12 in minimum. <br /> FORWARD COMPOST FACILITY STORMWATER IMPROVEMENTS GEOSYNTHETC <br /> 02777 7 CLAY LINER <br />
The URL can be used to link to this page
Your browser does not support the video tag.