My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0517379
>
ARCHIVED REPORTS_2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 11:24:49 AM
Creation date
7/3/2020 11:19:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014
RECORD_ID
PR0517379
PE
4466
FACILITY_ID
FA0007101
FACILITY_NAME
FORWARD INC LANDFILL
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
02
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4466_PR0517379_9999 S AUSTIN_2014.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. The overlaps shall not be nailed or stapled to the subgrade. <br /> E. Granular bentonite shall be placed on the overlaps. <br /> 3.7 MATERIALS IN CONTACT WITH THE GEOSYNTHETIC CLAY LINER <br /> A. Installation on rough surfaces shall be carefully performed to minimize damage to <br /> the geosynthetic clay liner. <br /> B. Equipment used for placing soils shall not be driven directly on the geosynthetics <br /> overlying the geosynthetic clay liner. The following table shall be complied with <br /> during construction: <br /> Maximum <br /> Equipment Ground Pressure Initial Lift Thickness <br /> (psi) ft <br /> 5 1.0 <br /> 10 1.5 <br /> 20 2.0 <br /> >20 >3.0 <br /> C. Installation of the geosynthetic clay liner areas with appurtenances areas, and <br /> connection of the geosynthetic clay liner to appurtenances shall be made according <br /> to the Construction Drawings. The GEOSYNTHETICS CONTRACTOR shall <br /> ensure that the geosynthetic clay liner is not damaged while working around the <br /> appurtenances. <br /> 3.8 REPAIR <br /> A. Any holes or tears in the geosynthetic clay liner shall be repaired by placing a <br /> geosynthetic clay liner patch over the hole. On slopes greater than 5 percent, the <br /> patch shall overlap the edges of the hole or tear by a minimum of 2 ft (0.6 m) in all <br /> directions. On slopes 5 percent or flatter, the patch shall overlap the edges of the <br /> hole or tear by a minimum of I ft(0.3 m) in all directions. The patch shall be <br /> secured with a water-based adhesive, if approved by the Manufacturer and by the <br /> QA/QC CONSULTANT. <br /> B. Care shall be taken to remove any soil or other material that may have penetrated the <br /> torn geosynthetic clay liner. <br /> C. All repairs shall be made at no additional cost to the OWNER. <br /> D. The patch shall not be nailed or stapled. <br /> FORWARD COMPOST FACILITY STORMWATER IMPROVEMENTS GEOSYNTHETC <br /> 02777 8 CLAY LINER <br />
The URL can be used to link to this page
Your browser does not support the video tag.